Senior Superintendent

Name : Scott Ellis
Industry Type : General Contractors - Managers
City & State : Hazel Park,MI
Job Title Senior Superintendent
Relocation Preferences : Relocate anywhere
Objective : Hard working, strong superintendent is looking for long term work with a rep. construction firm.
Resume :  
Scott R. Ellis
450 West Elza, Hazel Park, MI 48030
Hm: (248) 543 -0993 Moblie: (248) 515-9960
Email: ellis.scott[at]sbcglobal.net
Experience:
Skanska Building USASenior Superintendent
Southfield, MI Responsible For:
June 1998 March 2009 Large Utilities Installation
Value engineering & Constructability review
Contract Management, Client reporting
Field Management, Scheduling, Project Logistics
MEP Coordination, Preventative Maintenance
Commissioning, Cost Management
Construction of facilities from $2 mil - $250 mil. Some projects included - Greektown Casino / Hotel
AAA Michigan 6 megawatt generator facility, Detroit Performing Arts High School, Northville School, Hazel Park Schools, Twelve Oak Mall.

ARC Management & DesignProject Manager, Senior Designer
April 1990 Dec 1998 Responsible For:
Production & Development of Contract Documents (all disciplines)
Consultant Design Coordination
Process Design & Layout
Machine Design, Ergonomic Review and Implementation
Field Management & CPM Scheduling
Production Line Commissioning, MEP Coordination
Cost Management
Preventative Maintenance Program
Facilities Expansions ranging from 15 million to 275 million. Raw goods processing, assembly lines, PLC retrofit / automation, packaging lines, blast freezers, dryer systems, fluidizing systems, conveyors, product delivery systems, clean room testing labs, power expansion, and boiler replacements. Facility reviews, Capital Cost Planning & Requisitions.

University of Western OntarioProject Scheduler, Critical Path Manager
April 1996 Feb 1997 Responsible For:
Project Analyst
Force Management
Cost Management and Reporting
Internal Force Management - Hired as a consultant to develop internal schedule for staff manpower. Track capital projects within the university programs, and perform cost/job reporting to upper management.

Fanshawe CollegeInstructor, Industrial Apprenticeship Trade School
St. Thomas, Ontario Teaching:
April 1996 Sept. 1996 Machine Shop Computers (CPTR069A)
Industrial Maintenance Mechanic Computers (CPTR190A)
Marketing Purchasing Applications (MKTG461)
AutoCAD, Qbasic, Excel, Word, Windows
Instructor: Teaching Industrial Apprenticeship course on computers. CNC programming, AutoCAD, Excel, Word

Lamb & Warman ArchitectsProject Coordinator, Senior Building Technologist
London, Ontario, Canada Responsible For:
May 1987 Dec 1993 Contract Administration
Coordinate Engineering design development
Production & Development of Contract Documents (all Disciplines)
Supervision of Staff
Project Coordinator: Responsible for coordinating all disciplines, and construction of the contract documents for Owner and City review.


Affiliations:

Association of Architectural Technologist of Ontario
Accredited Architectural Technologist (1995 2001)
Ontario Association of Certified Engineering Technicians and Technologists
Applied Science Technologist (2000-2004)
(Civil & Building Design)

Florida State Builder #CBC06235 (2001 present)

Tau Alpha Pi National Honor Society (2007)
GPA (3.7)

The National Society of Collegiate Scholars (2009)
GPA (3.7)


Education:

Mechanical Engineering Technology Program
Wayne State University

Electrician Diploma, with Highest Honors
International Correspondence School

Locksmithing Diploma, with Highest Honors
International Correspondence Schools

Civil Engineering Science Program
University of Western Ontario

Architectural Technology Program
Fanshawe College

Application Software:AutoCadMicroStation
WordExcelMicrosoft ProjectsPrimavera






Partial Project Listing Scott R. Ellis

Industrial Manufacturing
Imperial Leaf Tobacco-$280 Million
o45 Acre under roof complex. (Renovation & Addition to complex)
oReplacement of all processing lines and conversion to PLC automation
oInverted building system to maintain 80% RH within processing floor
oDesign of processing systems and layout
o500+ craft workers per day on-site for installation
oBuilding and line commissioning
oQuality Control testing labs
oUpgrade of steam boilers and Power grid
oAccelerated Schedules
Ault Foods - Bathurst Street (Raw Milk & R&D) $45 Million
oRework of existing bottling and packaging lines
oAddition to existing building
oRenovation / addition to Research & Development testing labs
oNew Clean Room Testing Labs
oTaste testing facility & with associated kitchen preparation rooms.
Ault Foods - 401 Plant (Ice Cream) -$120 Million
oAddition for Haagen Daz processing Line
oAddition to the blast freezer, storage freezer, and loading dock
oInstallation of new packaging & pick lines
oRaw Milk receiving bay
oOnsite Waste Treatment plant
Cuddy Foods Cuddy Blvd, & Trafalgar Ave (McDonalds)$75 Million
oRenovation to existing chicken kill plant
oAddition for new chicken McNugget processing line
oInstallation of temporary McNugget processing line at Trafalger Plant
AAA Michigan Generator Facility (6MW)$7.0 Million
oNew power generator plant
oThree 2MW diesel generators (13.2kV)
oDiesel tank storage facility
oPower shedding thru existing building switchgear to primary grid



Institutional Facilities
Medical Facilities
Tweed & District Community Health Center$17 Million
oFuture Hospital Phase
oX-Ray rooms
oTesting labs
oLong Term Care
oSenior Apartments
University of Western Ontario$8.0 Million
oCancer Testing laboratories
oAnimal storage & testing labs
oResearch Testing laboratories
oClean Rooms
oComputer Rooms


Nursing Homes / Retirement Facilities
Wildwood Nursing Home, St. Marys$8.0 Million
o62 Bed Long term Care
Fiddick Nursing Home, Petrolia$7.0 Million
o92 Bed Long Term Care
o1 Respite
o36 Bed Retirement Home
Gateway Community Health Center, Tweed$3.0 Million
oMedical services, X-ray, Testing labs
oFuture Hospital, long term care, & Apartments
Huronview Home for the Aged$12.0 Million
o120 Long term care
o20 Senior Apartments
Huronlea Home for the Aged$7.5 Million
o64 Long term care
o 20 Senior Apartments
Eden House Nursing Home, Guelph$5.3 Million
o58 Bed Nursing Home
o20 Bed Retirement Home
Country Meadows Retirement Home$4.5 Million
o50 Bed Long term care

Churches
Salvation Army St. Thomas Citadel$6.0 Million
oNew Building on existing site
Salvation Army Tillsonburg Corps Hall$1.2 Million
oNew Building on existing site
K12 Facilities
Northville Public Schools, Northville, Michigan
o1999 Bond $90 Million
Cooke Elementary School Interior renovations & lifting sinking building
Silver Springs Elementary Classroom additions (Radius building)
Amerman Elementary Interior Renovations & upgrades
o2002 Bond$60 Million
Hillside Middle School Conversion from a high School to middle school
Amerman Elementary Building additions & renovations
Winchester Elementary Addition to existing school (Radius building)
o2004 Bond$ 45 Million
Hillside Middle School Energy Upgrades (Power & Lighting)
Amerman Elementary Energy Upgrades (Power & Lighting)
Silver Springs Elementary Addition of cafeteria & multipurpose room
Winchester Elementary Addition of cafeteria & multipurpose room
Ridgewood Elementary Two classroom additions
Hazel Park School District, Hazel Park, Michigan$60 Million
oHazel Park Junior High New building
oFord Elementary Building addition & Renovation, MEP upgrades
oHoover Elementary Addition & Interior renovations, MEP upgrades
oWebb / Jardon Elementary School Interior renovation & roof replacement
oHazel Park High School Interior renovation, MEP upgrades
Performing Arts High School, Detroit, Michigan$144 Million
oSilver Leed Certified Building
oWorking Radio Station & Television Studio
o1200 Student High School
o850 Person auditorium with 6 storey fly loft
Royal Oak School District, Royal Oak, Michigan$60 Million
oNorthwood Elementary - New facility & demo existing
oRoyal Oak High School Athletic Field New turf field & practice field / track
oLarge underground storm water detention basin
Commercial Buildings
Retail
Mejier Store #64, Ann Arbor, Michigan$15 Million
Building additions (precast & Steel)
Complete exterior & interior renovation
Mejier Store #27 Yipsilanti, Michigan$17 Million
Building addition (Precast & Steel)
Complete exterior & Interior renovation
Jacobsons Indianapolis, IN$12 Million
120,000 sqft /three storey existing building renovation with Mall
60,000 sqft of new marble floors
Renovation performed while building is open for business
6 month project Accelerated schedule
Jacobsons Altamounte Springs, FL$10 Million
Complete renovation of existing building
New escalators installed in radius opening
Major structural shoring
Roof replacement
Jacobsons West Palm Beach, FL$19 Million
New building

Hotels
Greektown Casino Hotel$250 Million
o32 Storey High Rise Hotel (Post-Tension)
o400 room hotel
o3400 car parking deck ( pre-cast plank)
oGaming floor & event center addition (Structural Steel & masonry)
oBuilding completely open four months after last concrete pour
oAccelerated Schedule
oLead Superintendent for hotel