Piping Designer

Name : Jaime R. Ella
Industry Type : Design Build Firms- EPC
City & State : Houston,TX
Job Title Piping Designer
Relocation Preferences : Yes
Objective : I have (23 ) years experience in design, estimating and construction in oil & gas project. I am capable of working independently or as a member of a team and feel confident of my ability to provide quality performance in any assignment that I undertake..

Resume :  
NAME : JAIME R. ELLATitle: Piping Designer
ADDRESS: 2701 Calico Creek Ln., Pearland, TX. 77584
PHONE # 713-340-0136
E-MAIL ADDRESS: jaime_r_ella[at]yahoo.com

Education:
Bachelor of Science in Mechanical Engineering, Far Eastern University-Philippines
Certificate in CAD, Mapua Institute of Technology-Philippines
Certificate in SPED, Houston Community College-Texas

Ambitious result oriented piping/pipeline designer, mechanical engineer/estimator, construction supervisor, piping draftsman and field engineer with 23 years experience in design, estimating and construction for refinery, liquefied petroleum gas, gas oil separator plant and wastewater & treatment plant. Excellent reputation for consistently bringing projects in on time and under budget. Proficient and independently handling big projects.

January 2009-August 2009: Chevron Base Oil Project. (BECHTEL)
Piping Designer
Prepared detail drawing for vents, drain and instrument connections (Microstation).
Valve take off on P & ID.
Inputting valves into pipeworks.
Isometric (piping) Coordinator using 3DTracker
Isometric (piping) extraction from PDS

January 2007- December 2008 Motiva Project (BECHTEL)
Piping Designer
Valve take off on P& ID.
Help process group in checking P& ID.
Checked mechanical data sheet, process data sheet, P& ID and plan & elevation drawing if they are the same (flange rating, nozzle size & specifications).
Checked vendor drawing and plan & elevation drawing if they are the same.
Checked line sizes and specification on the continuing drawing if they are the same.
Knowing also which service assignments meet the required material specifications (carbon steel, stainless steel, etc., which specifications are NACE compliant).
Checked piping isometric drawing based on P& ID and piping material specifications.
Checked pipe spooling/piping standard drawing (vents, drains, instrument connection, steam trap, and utility stations).
Inputting piping materials into pipeworks.
Prepared material requisition (quotation and purchase).

April 2005-December 2006 Cajun Constructors Inc.
Mechanical Engineer/Estimator
Read scope of work and their material specifications.
Prepared material take off as per their material specifications.
Prepared labor man-hours based on the material take off.
Research for material supplier for request for quotations.
Prepared labor and material cost.
Prepared direct and indirect labor cost.
Prepared equipment schedule.
Prepared work schedule (bar chart).
Prepared bid estimates.
Prepared equipment cost.

2003-2004 Luwa USA Inc.
Pipefitter/Duct Installer
Fabricate and install piping for HVAC
Fabricate, assemble and install duct works.

2001-2002 City of Dallas
Water Utility Field Rep.
Water utilities maintenance
Changing old water meters.

1994-2001 Dynamic Details Inc.
CNC Operator
Fabricate printed circuit/wiring board.
Adjust program if necessary.

1992-1993 Bugshan Stone and Webster; Saudi Arabia
( U.S. Affiliation: Stone and Webster Engineering Corp.)
Piping/pipeline Designer (ARAMCO)
Prepared plan drawing based on P& ID, Plot plan and as per their material specifications.
Prepared isometric drawing base on plan drawing.
Prepared spooling and fabrication drawing.
Prepared bill of materials as per their material specifications.
Prepared hydrostatic test diagram based on P & ID.
Prepared as built drawings.

1990-1991 Arabian Consulting and Engineering Center; Saudi Arabia
(U.S. Affiliation: Stone and Webster Engineering Corp.)
Piping Designer (ARAMCO)

1989-1990 Atlantic Gulf and Pacific Inc.
Mechanical Engineer/Piping Estimator (ARAMCO)
Read scope of work and their material specifications.
Prepared material take off as per their material specifications.
Prepared labor man-hours based on their material take off.
Research for material supplier for request for quotations.
Prepared labor and material cost.
Prepared direct and indirect labor cost.
Prepared equipment schedule.
Prepared work schedule (bar chart).
Prepared bid estimates.
Prepared equipment cost.

1987-1988 Atlantic Gulf & Pacific Co. Inc./Snamprogetti (ONGC of India)
Senior Piping Designer
Prepared plan drawing based on P & ID , plot plan and as per their material specifications.
Prepared isometric drawing based on plan drawing.
Prepared spooling and fabrication drawing.
Prepared bill of materials as per their material specifications.
Prepared hydrostatic test diagram base on P & ID.
Prepared as built drawings.

1985-1986 AGAP Arabia Ltd. (Saudi Arabia)
Mechanical Engineer/Piping Estimator
Read the scope of work and their material specifications.
Prepared material take off as per their material specifications.
Prepared labor man-hours based on their material take off.
Research for material supplier for request for quotations.
Prepared labor and material cost.
Prepared direct and indirect labor cost.
Prepared equipment schedule.
Prepared work schedule (bar chart).
Prepared bid estimates.
Prepared equipment cost.
1983-1984AGAP Arabia Ltd. Saudi Arabia (ARAMCO Project)
Piping Supervisor
1981-1982AGAP Arabia Ltd. Saudi Arabia (ARAMCO Project)
Mechanical Supervisor
1980-1981 AGAP Arabia Ltd. Saudi Arabia (ARAMCO Project)
Structural Supervisor
Supervised fabrication and installation of piping/pipeline (process line, steam line, water line, boiler feed water line, etc.,(pipe support and pipe rack).
Supervised equipment installation such as boiler, heat exchanger, vessels, pumps, generator, compressor, etc.
Prepared necessary schedule and see to it that the work are finished on time with minimum cost incurred.
Studies plan and specifications so as to comply the work accordingly.
Checked availability of materials needed prior to fabrication and installation.
Prepared tie-in schemes and commissioning schedule.
1977-1979AG&P/Kellogg International Inc. Kuwait (Kuwait Oil Company)
Piping Draftsman
Prepared plan drawing based on P & ID, plot plan and as per their material specifications.
Prepared isometric drawing based on plan drawing.
Prepared spooling and fabrication drawing.
Prepared bill of materials as per their material specifications.
Prepared hydrostatic test diagram based on Piping and instrument diagram.
Prepared as built drawing.
1976-1977 Atlantic Gulf and Pacific Co. Inc. Philippines (Shell Project)
Field Engineer
Prepared hydrostatic test diagram.
Supervised hydrostatic testing.



Copyright 2013. All Rights Reserved.





View Resumes: mechanical engineer resume, electrical engineer resume, architect resume, construction resumes