Cell: (901)871-70606637 Poplar Woods Cle #3 Germantown, TN 38138Home: (901)755-6337
Seasoned Engineer with success in solving problems and providing solutions for manufacturing plant limitations. Skilled in project management, engineering, manufacturing, maintenance, preventive maintenance, cost savings and strategic planning.
Analytical Problem Solver, who diagnoses root cause, solutions and creates innovative design and management systems to eliminate problems.
BS, Manufacturing Engineering, University Of Memphis, Tennessee.
Associate, Mechanical Engineering, State Tech Institute Memphis, TennesseePROFESSIONAL EXPERIENCE
AGRI PROCESS INNOVATIONS Bio Fuel Process Design/Fabrication/Installation 7/1/08 to 11/30/08
Project Manager Quad County Corn Processors Ethanol Plant Upgrades
Managed $30MM Ethanol Plant Upgrade from Dry Milling to Wet Corn Milling.
Coordinated Engineering Design, Equipment and Material Procurement, Sub Contracts, Budget and Schedule.
Designed Process Piping Systems, P&IDs, Instrument List, Material and Equipment List and Work Packages.
Lurgi & Delta-T Corporation Ethanol Plant Engineering/Design/Build Contractors 2006 to 2008
Construction Engineer/Coordinator Onsite Construction for $160 M Ethanol Plants in Midwest
Daily on Site Project Management, Safety Promotion and Coordination of Subcontractors.
Coordinated Field Change Orders and Requests for Information.
Responsible for the Commissioning, Start Up and turnover of Equipment and systems.
Plant Engineer Ford Motor Company, 2002-2006
Led executive team through creation of comprehensive strategic noise abatement plan that allowed the elimination of hearing protection in 35% of Manufacturing Plant Areas.
Powerhouse Maintenance and Upgrades that resulted in upgrades that increased reliability of existing Steam, Compressed Air and Cooling Water Systems.
Duratek Nuclear Waste Treatment & Disposal provider, 2000 to 2001
Plant Engineer
Managed the upgrade of an existing facility to store and treat radio active wastes..
On Site coordination of Subcontractors for Structural Steel, Concrete Foundations, Process Piping, Ventilation and equipment installation. Start up and closing of Plant.
Jimmy Dean Foods Pork Sausage Manufacturing Plant, 1998 to 2000
Plant / Environmental Engineer
Managed Design and installation of Projects that increased production average from 275 Hogs/Hr. to 300 Hogs/Hr.
Responsible for Environmental issues and required documentation and reporting.
Responsible for HAZWOPER Team and Training to meet OSHA Requirements.
Arranged HAZWOPER Practice with local Fire and Emergency Response Personnel and Plant Personnel.
Process Systems Inc - Plant Engineering/Design/Build Contractors 1995-1998
Project Engineer -
On Site Design, Construction and Maintenance of WITCO Memphis Chemical Plant.
Responsible for Process Hazards Analysis and Management of Change for plant upgrades and maintenance.
Assigned to Arcadian Fertilizer plant to plan and execute a four week turn a round outage.
Onsite Construction Engineer for Wet Corn Mill Project in N.D. that was finished on time and below budget.
Roquette America Inc.- Wet Corn Mill in Keokuk, IA 1993-1995
Project Engineer -
Managed Project Budget Estimates, Estimates, Design, Material/Equipment Procurement and contracts.
Projects included Grain handling and storage, sweetener drying, Steam and Utility upgrades.
Quantum Chemical - Polyethylene Manufacturing 1992-1993
Contract Engineer -
On Site Engineering and Project Management for manufacturing upgrades and maintenance.
Projects included Grain handling and storage, sweetener drying, Steam and Utility upgrades.
Coors Brewing Company- 1980-1992
Project Engineer -
Engineer IV responsible for Golden Brewery, Aluminum Can Plant and Coors Shenandoah Brewery Start-up.
Designed and installed GE 20MW Steam Turbine Generator.
Developed Power Operation outage plans and met daily with Powerhouse Operations and Maintenance Group.