Bart D. Richardson 202 Morro Ave., Shell Beach, CA 93449
OBJECTIVE To foster a consultative relationship utilizing my strong work ethics, leadership, managerial and extensive experience in project management to help deliver collaborative construction solutions in Wind Turbine Industry, Heavy Civil Engineering projects to achieve client satisfaction. SUMMARY A dependable, honest, well-organized quality supervisor with 4 1/2 years wind turbine industry, 34 years oil and gas industry, mining and environmental cleanup experience. Major strengths in safety, planning, cost control and responsible work ethics. Assignments incorporated multiple districts and diverse geographic locations. PROFESSIONAL EXPERIENCE Wind Turbine Projects 2005 to Present General Superintendent Milford Wind Corridor, Milford, Utah 39 GE 1.5 MW and 58 Clipper 2.3 MW, Client First Wind General Superintendent Whispering Willow, Iowa Falls, Iowa Vestas Turbines, 3 week orientation with RMT, Client Alliant Energy Site Manager Pebbles Springs Wind Project; Arlington, OR 47 Suzlon 2.1MW Turbines, Client Iberdrola Site Manager McAdoo Wind Project; McAdoo, TX 100 GE 1.5 MW Turbines, 26 miles 34.5kv T-Line and Sub Station, Client Invenergy LLC Construction Manager Roscoe Wind Project; Roscoe, TX 97 Mitsubishi 1.0 MW Turbines, Sub Station and Transmission Line, Client - Airtricity Construction Manager Camp Springs Wind Project, Snyder, TX 87 GE 1.5 MW Turbines, Sub Station, T-Line, and OandM Building, Client Invenergy LLC Construction Manager Horse Hollow Project (Phase II andIII) Taylor and Nolan Counties, Nolan, TX Phase II 130 Siemens 2.3 MW Turbines, Roads, Foundation, T-Line and Sub Station Phase III 151 GE 1.5 MW Turbines, Sub Station, T-Line and OandM Bldg: Project of the Year Award Superintendent Maple Ridge Wind Farm; Lewis County, NY: Project of the Year Award 120 Vestas 1.65 Turbines (Phase I), Roads, Foundations and Right-a-way Clearing for Interconnect system and Transmission Lines Construction Manager, Pioneer Technical Services, Inc., Butte, MT 1999-2005 Contracted to provide consulting services, cost estimating, bid proposals and on-site project supervision On-site supervision for remote pilot water treatment facility leading to full-scale facility On-location oversight for mine waste removal, repository construction, stream relocation/stabilization and remediation of sites Construction Supervisor, ARCO Environmental Remediation, LLC, Butte, MT 1992-1999 Supervised construction of three RCRA C repositories involving high levels of quality control Supervised excavation, stabilization, and disposal of 538,000cy of flue dust directed by EPA Team leader for construction team to remediate and build 200 acre site for the Jack Nicklaus golf course Oversaw waste site reclamation, and storm-water catch basin construction in metropolitan area Constructed largest soccer complex in Montana, ball fields, trails and parks for the local community Drilling Supervisor, ARCO Oil and Gas Co., Alaska/Central District/Western District 1980-1992 Supervised the direct-on site construction, drilling and clean-up operations in Alaska and 15 western states PROFESSIONAL EDUCATION AND TRAINING AAS Mechanical EngineeringTeam Building Site Safety School, Supervisor and RefresherConstruction Claims Seminar DuPont Managing SafetySoil Liner and Covers for Landfills Dam Safety Design and ConstructionSpeak with Credibility Excavation/Trenching Competent PersonCritical Lift 40 Hour Hazwoper TrainingRigging Certificate
References Available Upon Request
|