Engineering Scheduler Technical Writer

Name : iambullock
Industry Type : Engineers
City & State : Hazel Green,AL
Job Title Engineering Scheduler Technical Writer
Relocation Preferences : No
Objective : A project management or engineering development position utilizing analytical, planning, coordination and leadership skills to improve project efficiency for an aerospace company.
Resume :  
ROBERT B. BULLOCK
129 Jacob Landing Drive
Hazel Green, AL 35750
Home: 256.828.5355Cell: 256.683.1145
Email: IAmBullock[at]mchsi.com
________________________________________
PROFESSIONAL SUMMARY
Project management professional with extensive experience in diverse engineering environments. Proven ability to organize the work, develop and manage cost and schedule baselines, analysis of data, and management of the change control process. Coordinated on-time manufacturing, testing, packaging, handling and shipping for a prime NASA contract. EVM Analyst for Specialty Engineering IPT on the Secure Borders Initiative Network. Space Flight Hardware verification requirements development and closure. Self-motivated, highly-organized professional with exceptional coordination, planning, analytical and leadership skills. Technical skills include Microsoft Office Suite, Microsoft Project Professional 2007, Excel, EVMS, Oracle, Open Plan Professional, BOE, SOW, WBS, Milestone Professional, DOORS Training, Fish Bone Analysis

HIGHLIGHTS OF QUALIFICATIONS
Project Management Contract Negotiation Strategic Planning
Facilitation Process Improvement Proposal Support
Verification Requirements Dev Relationship Development Problem Solving
Process/Procedure Development Adaptable Technical Writing

SELECTED PROFESSIONAL ACCOMPLISHMENTS
Developed, as the POC for the NASA MSFC PMIC COTR, the first Mission Peculiar Equipment Development Plan. Analyzed contractual and FAR requirements and developed a schedule divided into segments for design process and hardware development processes. Developed plans placing focus on near-term goals. Implemented sign-off documents as a mechanism for establishing, monitoring and integrating IPT elements, The plan included negotiated vendor and supplier delivery plans. Result: Reduced issues between hardware and design IPTs, allowing deliveries to be made on time.

Single handedly captured the subcontract for the hardware design and development of the control system for a 2.5 THz Laser Local Oscillator Subcontract to DeMaria Electro Optical Systems, Inc (DEOS), a JSC contractor. Space based experiment currently flying on a satellite in a polar orbit. Self trained in radiation hardening. Developed the ISO documentation on this project for TBEs first ISO Certified Contract. Result: Delivered the components, sub assemblies and special test equipment for integration at DeMaria Electro Optical Systems on time and within budget.

Developed graphics for the operations and maintenance plans for electronic boxes utilized in an EXPRESS Rack used on the International Space Station. Analyzed available documents replaced drawings with digital photos and utilized OCR Software to reproduce text and graphics into a new document. Result: Reduced volume of text while increasing document usability.

Created facility requirements and operating procedures for the 100K Class clean room developed for the assembly and integration of subsystems on the Mission Peculiar Equipment Support Structure (MPESS). Defined design parameters and developed operating procedures for facility operation. Result: Improved company capability to assemble hardware and subsystems ready to be introduced into the level of cleanliness required at customer facility.

SECURITY CLEARANCE: Secret Active, DHS/CBP Suitability
ROBERT B. BULLOCK
129 Jacob Landing Drive
Hazel Green, AL 35750
Home: 256.828.5355Cell: 256.683.1145
Email: IAmBullock[at]mchsi.com
________________________________________
PROFESSIONAL OBJECTIVE
A project management or engineering development position utilizing analytical, planning, coordination and leadership skills to improve project efficiency for an aerospace company.

PROFESSIONAL EXPERIENCE
Techni-Core / United Launch Alliance
Real-Time Fish Bone Analyst 2009
Analyst, Observer, Interviewer and Technical Writer for Real-Time Fish Bone Analysis. Processed critical lift plans for Delta and Atlas Rockets and their components. Revised procedures, processed yellow and red risk mitigations, tool design and follow up classroom Fish Bone reviews. Implemented the use of video and voice recorders to enhance the analysis and add graphic content to the revised procedures and processes.

Qualis/Jacobs ESTS
Scheduler/Planner Ares/FITO/Integrated Vehicle Ground Vibration Test (IVGVT)2008
Element Scheduler/Planner for the Ares/Flight Integration Test Office/IVGVT. Continuing schedule maintenance for a task in progress. Transitioning the schedule from MS Project to MS Project Server. Lead the development of Support Engineerings Special Test Equipment schedule. Developing the linking requirements between the two schedules. Developed weekly and 90 day look-ahead reports for the IVGVT Team. Development of weekly notes of IVGVT accomplishments some of which were published to the Ares Web Site.

Techni-Core / Boeing2007-2008
Earned Value Management (EVM) and Engineering Technical Writer
Programmatic support to multiple projects on the Secure Boarders Initiative Contract. Developed schedules and budgets for Specialty Engineering for projects within SBInet. Schedules and Budgets were placed into the Boeings EVM System. Worked closely with the five Specialty Engineering disciplines to develop Cost Account Management Logic to support the EVMS. Updated the EVM System and Integrated Master Schedules weekly. Prepared and presented weekly and monthly financial reports. Alternate CAM. Mentor for another scheduler/planner.

West Corporation, Huntsville, AL2007
at&t Cellular Customer Service Representative

Teledyne Brown Engineering, Huntsville, AL 1979-2006
Manufacturing Engineer 2006
Provided support to military hardware proposals; Collected/organized material quotes

ISS Payload Data Library (PDL) Helpdesk Manager 2003-2005
Managed helpdesk activities; Answered customer questions, resolved problems and managed account maintenance; Participated in the development of latest PDL (a requirements traceability software package) release
Provided weekly statistics on user access and Helpline Ticket status; Authored process procedures to all helpdesk operations; Maintained relationships with over 800 scientific and engineering customers
ROBERT B. BULLOCK
129 Jacob Landing Drive
Hazel Green, AL 35750
Home: 256.828.5355Cell: 256.683.1145
Email: IAmBullock[at]mchsi.com
________________________________________
Engineering Technical Writer 1999-2003
Edited the International Space Station (ISS) Verification Plan
Provided the verification test requirements sections for Boeings O&M Manuals for EXPRESS Racks and EXPRESS Rack variants. Supported the Suitcase Simulator Manager in O&M Manual Development and hardware maintenance.

Systems Engineer 1998-1999
Provided support to the Boeing Lead Systems Engineer for the development of verification closure inputs for the Payload Rack Checkout Unit and the Payload Software Integration and Verification Facility Equipment; Closed 176 verification requirements covering electronics, electrical, fluids supply, vacuum, vacuum venting and water cooling systems, command and control systems. Provided input to the Microgravity Research, Development and Operations Contract proposal; Inputs covered Materials and Procurement, Logistics, Inventory Management and Spaceflight Hardware Assembly/Test/Verification

Project Manager / Systems Engineer 1997-1998
Managed the hardware design and development of the control system for a 2.5 THz Laser Local Oscillator-Subcontract to DeMaria Electo Optical Systems, Inc (DEOS); Developed the winning proposal submitted to DEOS, then managed the development of the inputs through DEOS and NASA Jet Propulsion Laboratory RFP

Manager/Project Engineer - Hardware Development Team1979-1997
Responsible for successful management of all Payload Mission Integration Contract (PMIC) (Spacelab, NASA) hardware development; Effectively applied project planning and controls from mission concept through the hardware fabrication, test and delivery process and coordination of hardware at Kennedy Space Center; Led Hardware Development Leads (Project Engineers), Hardware Engineers and one Expediter
Managed development resources to achieve a 100% on-time delivery schedule; Utilized innovative and creative practices to develop relationships between internal and external suppliers to facilitate hardware development within budget and schedule criteria
Interfaced with Contracts, Finance and PMOs to ensure that project codes were properly setup to support billing, cost reporting and cost collection needs of Finance and E&P
Resolved problems with the hardware to include developing Engineering Changes and handling the closure of Nonconformance Reports and direct interface with DCAA
Proposal Team lead for the development of the PMI Contract to include the SOW, WBS, BOE, Integrated Master Schedule and Plan in accordance with the applicable FAR requirements.

EDUCATION:
BSE-Electrical Engineering, University of Alabama in Huntsville
Post Graduate Classes-Information Technology, Finance & Marketing

TECHNICAL SUMMATION
Real-Time Fish Bone Analysis / Earned Value Management Specialist
EXPRESS Racks & Variants and Suitcase Simulator
Verification Closure of PRCU/PSIVF Requirements
Shuttle / Spacelab / SRB Hardware Development
SECURITY CLEARANCE: Secret Active, DHS/CBP Suitability

Copyright 2013. All Rights Reserved.





View Resumes: mechanical engineer resume, electrical engineer resume, architect resume, construction resumes