My name is Chris Lundgren and I am an experienced construction superintendent. I have over 25 years experience including safety and equipment, and personnel training. I can perform most duties of a project manager. Please review my resume to see if I may qualify for any supervisor position available. Travel relocation OK.

Thank you,
Chris Lundgren
951-324-3088
Resume :  
Chris Lundgren
Education

1981 to 1985Pima Community College, Tucson, AZ
4 Year Carpenter Apprenticeship Program

Experience
Specialties:
Safety trained for over 20 years
2001 AWWA Award Santa Monica, CA : Dry weather run off project
OSHA, Hazwoper, Hazmat, SCBA, CPR and First Aid, Confined Space Trained
Pre job planning to project closeout
Quality Control and inspection of all phases of construction for contract compliance
Supervise and direct all craft and subcontractor at any time
Well rounded superintendent with self perform construction background
Start up specialist for General Contractor including performance testing of equipment and client personnel training
Decision maker and problem solver
Clerical
Hiring and Termination of Employees
Creates and processes RFIs, RFQs, PCOs, RFDs
Estimates and processes change orders to $100,000
Obtain, review, and process submittals
Works well with staff and management to ensure quality performance of contractcompliance
Weekly Scheduling, Monthly Scheduling, Task Preparation, and Task Planning
Weekly meetings with engineers and owners
Handling completion of final punch lists, scheduling of reps on follow-up andcorrections of warranty items as required by contract
Assisted in setting up projects with labor unions, vendors and suppliers, includingfield offices
Review drawings and specifications relative to contract
Handling all accounting and cost controls
Construction
Extensive knowledge of inplant work as well as road work and traffic control
Earth work, Shoring, Dewatering, Asphalt, Traffic Control, and SWPPP
Concrete form work, structural and architectural, and placement
Mechanical equipment, Blowers, All Pumps, All Filters, Screening Equipment, Clarifier Equipment, Boilers, Heat Exchangers, Generators and Compressors
Piping, All below ground and above ground, insulated or not
Electrical- Mostly switchgear plus knowledge of instrumentation
Buildings- Block, concrete, framed, and metal
HVAC
2008 to Present Part time Consultant Cenergy Power Carlsbad, CA

2007 to 2008 Start up Superintendent for W.M. LylesMurrieta, CA

2007 2008W.M. Lyles$42 million
Henry Wochholz water treatment plant expansion, Yucaipa, CA
Plant startup of all major equipment and finalize job.

1989 to 2007Superintendent for Pacific Mechanical Corp.Concord, CA

2006 2007 Pacific Mechanical Corporation$5.8 million
Tracy Clark Power Plant, LG Constructors, Reno, NV.
Underground piping installation of 35,000 lineal feet HDPE 28 2, 1,500 lineal feet, cast 2,000 steel, completion of job and demobilization

2005 2006Pacific Mechanical Corporation$2.9 million
Three phase digester rehabilitation for Inland Empire Utilities Agency. Demolition of digester roof and replace with concrete install heat exchanges, boiler, all piping, coordination of subcontractor, completion of job, and demobilization.

2004 2005Pacific Mechanical Corporation$1.8 million
Pretreatment plant upgrade for the State of California.
Install and operate temporary filter press, demolition of existing facilities, install new structure, filter presses, compressors, and piping, coordination of subcontractors, start-up, job completion, and demobilization.

1989 2004Pacific Mechanical Corporation $500K - $10 million each
Fifteen jobs including pump stations, tunnel repairs, well fields, environmental plants, chlorination facilities, sludge dewatering facilities, digester rehab facilities, and head works to out fall.

1987 1989Foreman for Ziebarth and AlperHuntington Beach, CA

1988 1989Ziebarth and Alper
Plant 2 Huntington Beach Digester. Huntington Beach, CA.
1987 1988Ziebarth and Alper
EMWD Hemet Sewer Treatment Expansion. City of Hemet, CA.

1981 1987Other Companies throughout Southern California and Arizona.

1986 1987Kiewit Pacific Company

1985 1986Bechtell Corporation
Brady and Redrock Stations for the Colorado River Project. Arizona.

1981 1985Granite Construction.
Simpsons Structures.


*COMPLETE JOB LISTINGS AND REFERENCES AVAILABLE UPON REQUEST*


CHRIS LUNDGREN

Copyright 2013. All Rights Reserved.





View Resumes: mechanical engineer resume, electrical engineer resume, architect resume, construction resumes