Construction manager

Name : John Baldwin
Industry Type : General Contractors - Managers
City & State : Boston,MA
Job Title Construction manager
Relocation Preferences : N/A
Objective : To Obtain permanent position in the construction Industry.
Resume :  
John S. Baldwin
29 Reeds Lane
Holbrook, MA 02343
Home Phone: 781-885-1811
Cell: 617-240-1309
Email: jjbaldwin7b[at]aol.com

Objective: To obtain a permanent position as a Construction Manager.
Licenses & Affiliation Commonwealth of Massachusetts Unrestricted Construction Supervisor.
Occupation Safety and Health Training Course.

Professional Experience

2008 Present
McKay Construction
Construction Manager Supervise all phases of new construction, remodels, And build outs, both residential and commercial from pre-construction to project completion. Duties include but are not limited to: Cost
estimate/quotes; oversee day-to-day construction activities and coordination of subcontractors, vendors, architects, engineers and all project members; manage field changes; control schedules of both time and costs; materials quality control; workplace safety.
2006 2007
Connolly Brother Inc.
Superintendent Pingree School Ice rink fitness center addition.
Completion of one new building and three existing, which consists of loading Docks, interior fit outs, punch lists, pond reconstruction, and slab repair; Managed weekly job and safety meetings; revised two-week schedule; Take off
Materials, coordinated with in- house Architect, Project manager and staff; sign Off on purchase orders and change orders.

2004 2006
Carr Enterprises LTD.
Superintendent Projects consisted of addition renovation to Groton Boat House, Groton, MA. Interior build out Eastern Bank, Lexington MA. Covenant Christian School renovation, Peabody, MA. Hallmark medical office interior builds out. Renovation of Bright Horizons, Andover MA.
Set policy rules to subcontractors; insured that man power was accurate for each subcontractors so it would not impact the schedule; managed weekly safety and job meetings; revised two-week schedule on daily basis; generate rfi; take off and purchase materials; notified inspectional service for all inspections.
2003 - 2004
Construction Planners, Inc.
Project Manager/Supervisor Coordinated with the Senior Project Manger to determine project feasibility; managed and reviewed due diligence for accuracy and determined project challenges; prepared budget for design, construction, FF&E, impact fees, tap fees, and permitting fees; coordinated to determine project scope and responsibilities; coordinated with Owners and Suppliers to determine the schedule of the project; managed selection of contractors bidding or negotiating projects and awarded contracts; visited sites to verify schedules and quality; approved contractor and vendor pay applications and invoices; obtained a Certificate of Occupancy and any other necessary governmental approvals; close out project and associated cost and paperwork; followed up on warranty work.

Page 2

2002 2003
James J. Welch & Co. Inc.
Superintendent Unitarian Church Day Care Center Cohasset, MA. Followed rules, regulations, and company policy; established relationship with Building Officials and Fire Chief and scheduled a courtesy walk through; managed weekly Architect and Owners meetings; collaborated with subcontractors on a daily basis; updated scheduling; generated RFI and Daily/Weekly Reports; conducted weekly safety meeting to be applied in field operations; performed layout, purchased building materials; approved contractor and vendor pay application and invoices.

2000 - 2001
ADP Marshall/Fluor Daniels Co.
Superintendent Client list consisted of Intel Hudson, MA.BASF/Abbott Pharmaceutical Co., Worcester, MA and Bio Chem Pharma Pharmaceutical, Inc., Northborough, MA. Coordinated and supervised daily activities; participated at daily meetings with the General Superintendents, Project Managers, and Safety representatives; generated RFI/Corresponding with Engineers, and with the design team on a daily basis; conducted safety meeting once a week; provided daily reports, and two-week look-ahead to Owners and Architect; performed layout, and carpentry; attended clean- room training and procedures.

1997 - 2000
Craffey & Co. Inc.
Superintendent Client list consist of Mills Corporation, Dallas Texas; Mills Corporation, Nashville Tennessee and Mills Corporation, Sunrise Florida. Additional Clients: Ron Jons Surf Shops, Sports Authority, Marshalls, Books A Million, Alpha Omega, Zales, and Wal-Mart. Coordinated field operation and daily activities; produced daily field reports and two-week look-ahead for Owner and Architect; updated schedule on daily basis; provided lay out; purchased materials on a regular basis; assisted Project Managers in buyout of subs; approved contractor and vendor pay application and invoices; performed finish carpentry.

1995 - 1997
Construction Coordinator Inc.
Superintendent Clients consisted of CVS, Snip Its Haircuts for Kids, Dunkin Donuts, and Dewolf Reality. Managed and assisted General Superintendent on ground up CVS and Dunkin Donuts with lay out and grades; coordinated equipment deliveries and building materials daily; produced daily reports; provided carpentry skills as needed; obtained a Certificate of Occupancy and any other necessary government approvals.

1991 - 1995
Payette Associates
Superintendent/Foreman - Renovation of 285 Summer Street, Boston MA. Coordination of all sub contractors; managed daily activities and produced daily reports to Project Managers and the Design Team; coordinated purchase of all building materials; provided finished carpentry; managed the move to 285 Summer Street; constructed interior fitup for new tenants.

Education: Wentworth Institute Completed all classes for ABC License.









Copyright 2013. All Rights Reserved.





View Resumes: mechanical engineer resume, electrical engineer resume, architect resume, construction resumes