Design build project manager

Name : Tony Carr
Industry Type : Design Build Firms- EPC
City & State : Auburn,WA
Job Title Design build project manager
Relocation Preferences : will consider relocating
Objective : Would like to further my career in the Design build sector, perhaps working for consulting company. continuing to learn more is very important to me.
Resume :  

My objective is to direct others in a collaborative work environment in which our goal is to find effective and efficient ways to reduce costs while not ignoring important codes and standards governed by the NFPA or IBC. In these 30 years in the fire protection business, I have spent much of my career studying and learning the codes, keeping abreast of all changes and new technologies in the fire protection industry. Consequently, I have become a resource for company managers, and designers. This knowledge has also led to consulting outside the company with architects and respective engineers. Currently, I belong to the Design Build Institute of America, because I believe that belonging to the DBIA is an avenue to network with architects and other engineers. This also allows me to stay current in new trends in design build. I am the only member of DBIA who is in the fire protection industry, which gives me a unique position.
Experience
Smith Fire Systems1992 April 2010
Design Build Project Manager: 07-2010 Most recently I have worked with owners and Architects to efficiently design buildings utilizing the IBC and the trade-ups for fire sprinklers. I have several designers working under me who produce the design layout for coordination.
Design Build Projects Managed: Most recent.
oAvalon Towers Bellevue, Twin residential towers 40 stories combined. Budget $2,225,000.00 February 08 April 2010. Direct over site of Design development and coordination with other trades, I met with the Fire Marshal regarding code compliance. Updated budgets as the design progressed. Monitored field installation and labor tracking.
oJackson Building, Mixed use building with two levels parking and five floors residential. Budget $550,000.00. November 08 February 2010. Direct over site of design and coordination. Updated budgets as the design progressed. Monitored field installation and labor tracking.
oPanorama Skilled nursing facility: Multi - phased project of new two-story skilled nursing. Budget $500,000.00 November 07 March 2010. Direct over site of design and coordination with other trades. Updated budgets as the design progressed. Monitored field installation and labor tracking. Included reworking of existing services to existing buildings.
oYale Avenue Office Building: New office building 5 levels below grade and 5 above. Budget $550,000.00 July 08 December 09. Direct over site of design and coordination. Updated budgets as the design progressed. Monitored field installation and labor tracking.
Tenant improvement Manager: August 2000 November 07 -Started a new tenant improvement department doing most of the work myself then kept adding new persons to my team until we reached a team of four doing roughly 3 million a year in TI work. Projects ranging from small jobs relocating just a few heads to extending existing systems to retrofit the entire building.
Field Trainer: 1998- 2000 Developed training materials and Taught classes on all types of valves and equipment, setup new procedures and best practices for the field installers.
oDeveloped a two week orientation for new recruits, Trained them in proper use of tools and jobsite safety then took them into the field to train them in installation.

Service Department/Tenant improvement Field Superintendent.1992-1998 Started as installer then moved on to supervise and train all fitters in Installation, service and repair of fire sprinkler systems. During my time in the service department I handled annual testing and inspections of all types of fire sprinkler systems Wet, Dry, Pre-action Including fire pumps water storage tanks also high rise standpipe system testing as well as some clean agent systems for computer rooms. I developed training for my field crews both in NFPA codes as well as trouble shooting of fire sprinkler equipment. System repair verses replacement was also one of my goals for my crews.
MacLot Plumbing and Fire protection1991 - 1992
New installations and tenant improvement.
Fire protection specialists1986 - 1991
Job Forman to Field Superintendent after 3 months.
oNew installations in commercial construction also tenant improvements.
oLarge residential projects with CPVC/ copper installations.
oForman on Large Underground piping projects. Learned to run heavy equipment.
oHospitals, Data center, Movie studios, News Paper printers. Installed special systems, Pre-action systems, Halon and carbon dioxide systems.
Adept Fire protection1979 - 1986
Apprentice pipe fitter to Job Forman after 2 years.
oNew installations also retrofit systems into existing buildings.
oResidential projects with CPVC installation.
oUnderground piping.
Education
Design Build Institute of America2009
Bates Technical College2000
Auto CAD Certificate
Bolsa Grande High School1976-1980
Skills
First of all, I am a self-starter, and require minimal direction due to my extensive experience in the fire protection field. However, I am a promoter of the team building spirit within my company. Next, I have extensive knowledge of codes and keep current without exception. My 30 years in the fire protection industry has allowed me to reach this point where I am thought of as an expert. I am not stagnant in my goals to learn and continue to improve my knowledge and understanding of the codes. I am currently testing for NICET certification. Moreover, what sets me apart from other project managers is my experience in the field as an installer; thus I am able to provide direction during the estimating stage then through design and installation.

Copyright 2013. All Rights Reserved.





View Resumes: mechanical engineer resume, electrical engineer resume, architect resume, construction resumes