Construction Superintendent

Name : George achter
Industry Type : General Contractors - Managers
City & State : Houston,Tx.
Job Title Construction Superintendent
Relocation Preferences : no
Objective : supervise constion jobs
Resume :  

2007-2009 Richland Construction Company - Superintendent
20,000 sq. ft. office building-two story tiltwall
4,000 sq. ft. shopping center-block building
64,000 sq. ft. shopping center-tiltwall-two story

2006-2007J.O.A. Construction Company - Superintendent
13,000 sq. ft. fleet maintenance building

2004-2006U.A.T. Construction Company - Superintendent
60,000 sq. ft. shopping center
remodel doctor offices-4 buildings with Steel canopy, all new windows

2001-2004Rich-tex Construction - Superintendent
Added 2nd level to 12,000 sq. ft. bldg.-build out - Houston
15,000 sq. ft. metal bldg. Frame and build out - Tomball
20,000 sq. ft. metal bldg. Frame and build out Bear Creek
25,000 sq. ft. block bldg. Frame and build out Houston

1999-2001UBA Inc. - Superintendent
114 room hotel. Four floors and wood framing-Downtown Houston
Carwash and Lube-Hwy 6 in Bear Creek

1996-1999Rich-tex Construction - Superintendent
16,000 sq. ft. metal bldg. for Interstate Southwest Forge Company
Guard Tower, Federal Prison (maximum security)-Beaumont
20,000 sq. ft. build out for lease space for Sun and Ski-Webster
900 sq. ft. build out for Dental Office-Spring Branch
20,000 sq. ft. metal bldg. Warehouses-Spring

1995-1996Lynn B. Watkins Construction - Superintendent
Built three buildings for Noltex/Dupont :
2,400 sq. ft. office building with metal studs, brick, stucco, metal roof & parking lot-La Porte
9,600 sq. ft. stran open building with trench drains, pad with anchor bolts for metal tanks and second story steel floor-LaPorte
1,600 sq. ft. storage building with concrete block, footings, anchor bolts and multiple concrete pads-LaPorte

1992-1995Rich-tex Construction - Superintendent
One Bases Hamburger Store
Remodeled strip shopping center with 15 lease spaces (store fronts and interiors) 20,000 sq. ft. addition to Schultz Mobile Home-Navasota
Shell gas station & restaurant-Navasota
800 sq. ft. Dental Office built out-Houston

1991-1992Tony Crawford Construction - Superintendent
27,353 sq. ft. Cornerstone Post office
113,000 sq. ft. $2.5 million concrete??




GEORGE J. ACHTER


1989-1991Rich-tex Construction - Superintendent
Built two Bases Hamburger Stores, two Graffitis hamburger stores
Total renovation of 141 unit condo
Built Chevron gas station

1987-1989Mis of Houston-Halterman Labs - Superintendent
3,000 sq. ft. addition on existing metal building. New laboratories included underground utilities, slab, metal building, interior finish, laboratory furniture, fume hoods, sinks, drains, tops and cabinets-Channelview

1986-1987Mendez & Donnel & Associates - Inspector
George R. Brown Convention Center, $104.9 million project. Performed architectural and structural inspections including roofing, siding, tiling, carpet, painting, sheetrock, mechanical hardware, vinyl, concrete and sub-grade-Houston

1985-1986Target Construction Company - Superintendent
Gulf gas station, convenience store & carwash. Supervised layout, grading, underground concrete work, structural, electrical, gas tanks, pump installation and interior-Pearland
Remodeled doctors office. Gut building, layout and framed building, plumbing, electrical, re-roofing, painting, finished interior and exterior-Houston

1983-1985Sheldon L. Pollack Corporation - Superintendent
120,000 sq. ft., $1 million Strip shopping center with tilt wall construction Supervised layout, grading, underground concrete work, structural steel, roof decking, hot roof, aluminum store fronts, metal partitions and interior leased spaces-Dallas

1980-1983 Rich-tex Construction - Superintendent
Country Club- built club house, pro-shop and docking area
Strip shopping centers-Northwest Houston, Jones Road
14,000 sq. ft. building (12 lease spaces)-Huffmeister
10,000 and 20,000 sq. ft. metal buildings for warehouseing.
Three 7-11 stores including install of gas pumps and tanks-North Houston
Fifty apartments with wood frame, siding and metal carports-South Houston
Remodeled 8 Hartz Chicken stores with new equipment, floors, ceilings, paneling and plumbing-Houston
Arco-Channelview
Telecommunications Conference Center- Hi-tech electronics
12,000 sq. ft. Church classroom addition-Gessner

1977-1980Rogers 7 OBrien Construction Company - Superintendent
Erected a 100,000 sq. ft. metal warehouse for Frito Lay. Supervised and performed layout of metal building-Rosenberg

1975-1977T.O.S. Incorporated - Superintendent
Clear Lake Intermediate School, $2 million. Coordinated subcontractors, 70 man construction crew, layout, school grates, daily reports, time keeping, material ordering and receipts-

Copyright 2013. All Rights Reserved.





View Resumes: mechanical engineer resume, electrical engineer resume, architect resume, construction resumes