Construction Superintendent (MEP)

Name : Kurt Kashuba
Industry Type : Facility - Building Owners
City & State : Lunenburg,MA
Job Title Construction Superintendent (MEP)
Relocation Preferences :
Objective :
Resume :  
Kurt Kashuba
293 Burrage Street
Lunenburg, MA 01462
kashuba3[at]comcast.net
(978) 582-1180




Introduction:
Fifteen years experience in Management, Design and Operations for the semiconductor, pharmaceutical & biotech industries. Managed key engineering assignments that have played important rolls in some of the leading manufacturers. Responsible for overall management, engineering, procurement and construction of major projects from commitment through completion and client acceptance.

Experience:
McGrath & Company
Aug 08 May 09
Lonza Biologics Hopkinton, MA
Construction Superintendent (MEP)
Responsible for overseeing construction performance and productivity of laborers associated with the Parsons Construction project of Suites 7&8 Dirty Utility Systems. Responsibilities included: assuring work was completed to industry standards/specifications, walking down equipment and lines to verify installation through means of schematics and drawings, direct subcontractor meetings, maintain equipment delivery schedules and arrangements. Also direct day to day construction activities, overseeing and conducting customer inspections, coordinate state inspections, maintain safe work environment, orchestrated system start-up with equipment owners and vendors, completed system closeouts, oversee system and room readiness. Other duties include processing pay applications/AIA, invoicing approvals and writing new change order to keep up with current rev changes supporting the systems of which I was responsible for.

Dirty Utility Systems: Underground, Tempered Water System, Bulk Oxygen System, Bulk Nitrogen System, Compressor System, Clean Air, Instrument Air, Fire Sprinkler System, Tepid Water, Safety Shower System, Soft Water System, Plant Water, Hot Water Skid, Hot/Cold Domestic Water, Sanitary, Natural Gas System, Cooling Tower, Chiller System, Chilled Water Supply & Return Lines, Boiler Systems, High Pressure Steam, Medium Pressure Steam, Condensation, , Kill Drain Lift Station, Chemical Lift Station, Bulk Solvent Waste System, Solvent/Waste Vents, Solvent Lift Station, Neutralizations System, HVAC System, HVAC Waters.

McGrath & Company
Aug 06 -Apr 08
IMFT (Intel/Micron Flash Technologies) FAB 6 Manassas, VA & FAB 2 Lehi, UT
Project Manager
Manage and execute approved capital/expense tool installs with the Facilities Group. Responsible for the coordination of all aspects of tool installation: Develop overall project approach strategy, participate in scope development, critical path and funding approaches, project budget development including detailed cost estimates supporting scope change process. Project schedule development, coordinating between the project requesters needs, the engineering schedule work load, and the trade construction work loads. Plan review with emphasis on constructible and component lead times, coordinate with the area coordinator, the customer and engineering to budget quarterly and monthly construction work, submit for funding, control and monitor spending against the approved funding, control and monitor the schedule to meet critical project dates, communicate with all Micron regulatory groups.

McGrath & Company
June 05 - Aug 06
Intel Fab 17 Hudson, MA
Construction/Project Manager
Managed and executed approved capital/expense projects with the Sustaining Group. Managed the renovation of existing facilities, construction of new facilities and the installation/modification of existing site utilities. Responsibilities included working with Engineering and Design groups to create Detail Scopes of Work and Design Packages, preparation of ROM/Estimates, produced schedule based on customer, man loading, prepared RFP contract outline agreements with procurement group, vendor sourcing. Maintained weekly project reports, supplied technical support for contractors and maintained open communication with all essential parties to provide accurate and up to date information for customers, established financial report during course of projects. Other responsibilities included managing all outside activities such as excavation, soil/loam testing, soil/loam stockpile, site upgrade projects, maintaining existing civil & utility drawings, subsurface scans, vac services, connex box storage units, concrete stockpile and dumpsters.

Projects:
Managed basebuild flex
Managed tool down process
Installed contractor trailer park & all supporting services
Created temp parking for additional cars
Converted old site bank to new innovation center
Cafeteria expansion project
Member of site logistics group
Lobby security automation project
Renovated all site rest rooms
Replacement of all outside lighting
AHU replacement project
Installation of new parts clean area
AWN upgrade project
HD1 site improvement project
Installation of new OFA compressors and pads w/redundancy

Jacobs Engineering
June 04 - June 05
Wyeth BioPharmaceuticals Andover, MA
Project Manager
Managed and executed approved capital/expense projects with the Facilities Group. Projects included the renovation of existing facility, construction of a new facility, equipment procurement, installation/modification of existing site utilities and systems for GMP and non-GMP. Other responsibilities included Work Request, Work Orders, Passivations, Electropolishing, Validation, Change Control, Scheduling, preparation of ROM/Estimates, working with Engineering and Design groups to create Detail SOW and Design Packages, vendor sourcing, establishing financial report during course of projects, prepared RFP contract outline agreements with procurement group. Other responsibilities included all install/de-installs and relocations of the following pieces of equipment: Freezers, Refrigerators, Incubators, Centrifuge Systems, Fume Hoods BSCs, Shaker units, and Threshold Instruments as well as all monitoring devices such as RTD probes, chart recorders, back-up systems, calibration and security systems.

Projects:
Renovation of existing building space for new QRM facility
Managed inspections for all Suite/R&D process vessels
Responsible for all repairs to existing vessels and replacement vessels
CMS lab renovation
Renovation of existing building space for new gym & fitness center
Built new electrical shop
Built new video conference room
Renovated existing office space to create new MRG area
New record retention and service area including the installation of a new high-density file system

Applied Mechanical
Aug 00 - June 04
Intel Fab 17 Hudson, MA
Construction/Project Manager
Managed and executed approved capital/expense projects with the Sustaining Group. Managed the renovation of existing facilities, construction of new facilities and the installation/modification of existing site utilities. Responsibilities included working with Engineering and Design groups to create Detail Scopes of Work and Design Packages, preparation of ROM/Estimates, produced schedule based on customer, man loading, prepared RFP contract outline agreements with procurement group, vendor sourcing. Maintained weekly project reports, supplied technical support for contractors and maintained open communication with all essential parties to provide accurate and up to date information for customers, established financial report during course of projects. Other responsibilities included managing all outside activities including excavation, soil/loam testing, soil/loam stockpile, site upgrade projects, maintaining existing civil & utility drawings, subsurface scans, vac services, connex box storage units, concrete stockpile and dumpsters.

Projects:
Installed contractor trailer park housing 1800 contractors
Created temp parking for additional 1000 cars
Site containment upgrades
Ultra pure water metering project
Installation of new site sidewalks
New roadway project
New outside vestibule lobby entryway
Installation of new upper and lower parking lots
Site signage upgrade project
The construction of new outside smoking area
Construct new outside cafeteria eating area
Constructed all new site water retention areas
Upgrade all site PIVs (Post Indicator Valve)
Installed new 8 CDA loop from factory to CUB
New 10 PCW supply & return loop from factory to CUB
Installation of new CDA compressors and pads
Sulfuric acid/sodium hydroxide pump delivery system
Manage tool down process
Installed new liquid leak detection system in all chemical bunkers
Built new sustaining lab
EC lab UPS project
Installation of new guard shacks
Installation of auto sample bypass with metering
Installation of sample station and building

Mega-Kinetics
Aug 98 - Aug 00
Division of U.S. Filters Chandler, AZ
Mechanical Engineer
Responsible for documentation of standard/custom units and piping layouts of CMP/Slurry Chemical Systems for Vendor-of-Choice contract with major semiconductor manufacturers supporting worldwide chip manufacturing. Initiation and completion of cabinet designs. Duties also included schematic and facility layouts, bill of materials, build by packages, design of units, and to assist other departments with developmental designs, system layouts, and equipment start-up. Other responsibilities included on-site documentation of mechanical and electrical drawings.

Projects:
Intel Corporation, Micron Technology, Rodel Corporation, Simian Conductor Corporation, IBM Corporation, Symbios Logic, Spirox, National Semiconductor, Toshiba, Texas Instruments, Hewlett Packard Company, Harris Mountaintop, Microchip Technology, Olin Microelectronic, IPEC Corporation, Motorola Corporation, Asahi, TRW, AMD, White Oak Semiconductor, Sitix, LSI, Wafertech Technology and Fujitsu Corporation

Mega-Kinetics
Aug 94 - Aug 98
Division of U.S. Filters Chandler, AZ
Manufacturing Supervisor
Supervised 140 employees within the manufacturing department. Duties included employee training and certification, staff project scheduling for units on daily basis, maintaining clean room protocol, oversee pre-builds and installation of Teflon manifolds, stainless steel air sections, polyethylene lines, PVC/CPVC SCH:80/40 manifolds, as well as welded plastic components. Also performed pre-Q.A. test outs. Other responsibilities included project management, production scheduling, and implementation of manufacturing labor reduction and improved quality. Also prepared, presented, and reviewed flow charts to maintain seamless flow of essential departments. Maintained open communication with all departments to ensure quality production.

Computer Skills:
Familiar with most standard PC systems, Windows XP & NT, Microsoft Office, Novell, Outlook, Group Wise, Word, Excel, Mass 90, Power Point, Oracle PL/SQL, Microsoft Project, Maximo, Projeca, S.A.P, Primavera, REQ-It
AutoCAD, AutoCAD Light, Pro-Engineering, Corel Draw, Visio Viewer
Prime Contract Web Based Construction Management Database
IWCS Manager (project management and documentation control program)
ProLog Manager (project management and documentation control program)
DBO2 Safety Net (Design-Build-Own-Operate)
Share Point Web Based Construction Management Database

Certifications:
Stainless Steel Orbital Welding (Swagelok) June 24th, 1997
Socket Fusion (George Fischer GF) Nov 12th, 1995
PureBond Fusion (Fluoroware/Entegris) June 1st, 1997
Instrumentation and process lines (Parker) June 7th, 1995

Education:
Completed Pro-Engineering at Gateway Community College, AZ Sept 6th, 2000
Completed Auto Cad at Mesa Community College, AZ July 14th, 1999
Certificate of Completion for Team Leadership 40hr course (Seminars International) April 19th, 1995
Successfully completed courses in Management, Project Management, Foreman Training, Diversity/Civil Treatment, Code of Conduct, Negotiation Skills Training, Clean Room Protocol I, II, & III, Excavation and Trench Training, Safety Awareness, HAZCOM, HAZMAT, OSHA 10Hr, OSHA 30Hr, Confined Space Training, Particle Counting, Densitometry I & II

Copyright 2013. All Rights Reserved.





View Resumes: mechanical engineer resume, electrical engineer resume, architect resume, construction resumes