Electrician

Name : Bryan Cox
Industry Type : Electrical Contractors
City & State : Westfield,IN
Job Title Electrician
Relocation Preferences : within the state of Indiana
Objective : New installation, remodel, maintenence of electrical equipment.
Resume :  
Bryan Cox



EXPERIENCE

Foreman Electrician/Electrician

Over 20 years experience in all aspects of electrical installation covering industrial plant and commercial construction projects.



10/2009-12/31/2009 - Industrial Electric Inc., Indianapolis, IN
Electrician

(Eli Lilly Corporate Center) Installed conduit, cable, devices for new addressable fire alarm system. (Eli Lilly Technology Center) Installed necessary cable for new capper machine, landed wiring in control cabinet and capper machine.
Attended and completed PPE and safety procedure classes in accordance to OSHA requirements.



09/2008-10/2008 - Moorehead Electric, Indianapolis, IN
Electrician

Responsible for wiring, installation and testing of new electrical systems including circuits, outlets, load centers, panel boards and other equipment in the locations indicated by blueprints. Also installed the necessary conduit, wires, and cables and connected them to circuit breakers, transformers, or other components. Tested circuits for proper connections once the wiring was finished.
Worked at new LA Fitness Center in Carmel, IN.






09/2007-09/2008 - Barth Electric, Indianapolis, IN
Electrician

Working for this contractor, I was assigned as a foreman and responsible for keeping the team up to date with construction changes, deadlines, installation and safety requirements. Along with this role I was also responsible for keeping up to date material needs while maintaining quality inspections of the work performed to finished product.
Responsible for wiring, installation and testing of new electrical systems including circuits, outlets, load centers, panel boards and other equipment in the locations indicated by blueprints. Also installed the necessary conduit, wires, and cables and connected them to circuit breakers, transformers, or other components. Tested circuits for proper connections once the wiring was finished.
Worked at Lucas Oil Stadium. Extensive amount of work was from a boom lift.


05/2005-09/2007 National Construction Workforce, Indianapolis, IN
Electrician

Returned to this employer. See 08/2002-06/2003, below.


04/2005-05/2005 - The Venture Newburg-Perini, Wilmington, IL
Electrician

Worked a shutdown for maintenance and new install of communication cable at the Byron Nuclear Generating Station, Byron, IL. This plant provides electricity to northern Illinois and the city of Chicago.
This was a major project that required high level security clearance.


09/2004-04/2005 - National Construction Workforce, Indianapolis, IN
Electrician

Working for this contractor, I was assigned as a foreman and was responsible for keeping the team up to date with construction changes, deadlines, installation and safety requirements. In addition, I was responsible for keeping up-to-date material needs and maintaining quality inspections of the work performed to finished product.
Responsible for wiring, installation and testing of new electrical systems including circuits, outlets, load centers, panel boards and other equipment in the locations indicated by blueprints. Also installed the necessary conduit, wires, and cables and connected them to circuit breakers, transformers, or other components. Tested circuits for proper operation once the wiring was in place.


05/2004-07/2004 - Indianapolis Electric Company, Indianapolis, IN
Electrician

Responsible for wiring, installation and testing of new electrical systems including circuits, outlets, load centers, panel boards and other equipment in the locations indicated by blueprints. Also installed the necessary conduit, wires, and cables and connected them to circuit breakers, transformers, or other components. Tested circuits for proper connections once the wiring was finished.
Worked at (3) different Eli Lilly shutdowns to improve or change out equipment for new operations within the insulin production building.
Attended and completed PPE and safety procedure courses in accordance with Occupational Safety and Health Administration (OSHA) requirements.


07/2003-05/2004 National Construction Workforce, Indianapolis, IN
Electrician

Returned to this employer. See 08/2002-06/2003, below.


06/2003-07/2003 - M&R Constructors, Indianapolis, IN
Electrician

Worked on building racks for communication cable throughout Eli Lilly in their insulin plant


08/2002-06/2003 National Construction Workforce, Indianapolis, IN
Electrician

Working for this contractor, I was assigned as a foreman and was responsible for keeping the team up to date with construction changes, deadlines, installation and safety requirements. In addition, I was responsible for keeping up-to-date material needs and maintaining quality inspections of the work performed to finished product.
Responsible for wiring, installation and testing of new electrical systems including circuits, outlets, load centers, panel boards and other equipment in the locations indicated by blueprints. Also installed the necessary conduit, wires, and cables and connected them to circuit breakers, transformers, or other components. Tested circuits for proper operation once the wiring was in place.


10/2001-08/2002 - Pearson Electric, Indianapolis, IN
Electrician

Responsible for wiring, installation and testing of new electrical systems including circuits, outlets, load centers, panel boards and other equipment in the locations indicated by blueprints. Also installed the necessary conduit, wires, and cables and connected them to circuit breakers, transformers, or other components. Tested circuits for proper connections once the wiring was finished.
Involved in the construction of the new Cicero Middle School, and a school addition in
Avon, IN






04/2001-06/2001 - Roman Electric, Milwaukee, WI
Electrician

Hired to changed out Main services and branch circuits in schools to accommodate computers in classrooms.


06/2001-09/2001, Pieper Electric, Milwaukee, WI
Electrician

Hired in for new Peeker Plant construction. Worked here for the underground construction part of the contract.


05/2000-06/2001 - University of Wisconsin, Madison, WI
Maintenance Electrician

General maintenance of lighting and HVAC motors.


05/2000-07/2000 - Schaefer Electric, Rockford, IL
Electrician

Installation for new main service, lights, checkout lanes electrical needs. Hilander Grocery store.


11/1989-05/2000 - Branson Electric, Dixon, IL
Electrician

Working for this contractor, I was assigned as a foreman and responsible for keeping the team up to date with construction changes, deadlines, installation and safety requirements. Along with this role I was also responsible for keeping up to date material needs while maintaining quality inspections of the work performed to finished product.
While working with Branson Electric I completed my apprenticeship as an electrician. I started with them as a Residential Trainee then went on with the apprenticeship to complete my Journeyman Wireman status.
I was involved in residential, industrial, commercial construction, repair and maintenance.


08/1989-11/1989 - Weaver Electric, Rockford, IL
Electrician

My first job as a Residential Trainee.






Other Work Experience


05/1989-08/1989 - Rose Ford, Clinton, IA
Sales Assistant

Worked in the parts department, ordering, billing, stocking, over counter sales of automotive parts.
Had to be proficient of Fords numbering system of there parts. Provided service to the repair department.

Reason for leaving: Opportunity to enter Electrical Apprenticeship


08/1987-05/1989 - Western Auto, Dallas, TX
Sales Assistant

Assisted consumers in selection of proper automotive parts. Required knowledge of all products, good customer relations skills. Job also required inventory upkeep.

Reason for leaving: Moved to Illinois


05/1984-06/1986 - Scuba West (Dive West), Dallas, TX
Sales Assistant

Retail sales of scuba equipment and services. Ran cash register, replenished stock, kept store tidy, provided customers with recommendations of products.


08/1981-04/1984 - Montgomery Ward Catalog/Appliance Store, Sterling, IL
Sales/Customer Service Representative

Responsible for entering data to receive customers ordered merchandise. I also took care of returned merchandise and floor sales of the appliances.

Reason of leaving: Opportunity to move to Dallas,Tx


EDUCATION

1977-1981 Sterling High School, Sterling, IL
1992-1993 Sauk Valley College, Dixon, IL - AC Electronics, DC Electronics
1989-1996 Rock Valley College, Rockford, IL - NJATC Apprenticeship for Journeyman Wireman Certification



Copyright 2013. All Rights Reserved.





View Resumes: mechanical engineer resume, electrical engineer resume, architect resume, construction resumes