General Superintendent

Name : Steven Gray
Industry Type : General Contractors - Managers
City & State : Port Townsend,WA
Job Title General Superintendent
Relocation Preferences : Open
Objective :
Resume :  





Steven S Gray(360) 301 1027
30 Lindsey Lane, Port Townsend, WA. 98368Tommysdad7[at]yahoo.com
Professional Profile for the Position as General Construction Superintendent

Manage multiple projects and crews. Maintained client relation as well as establishing and keeping an open line of communication with the project Architects and Engineers. Proficient in the scheduling and cost analysis of projects. Duties in the past include: Estimating the base contract, Scheduling the Project, Negotiations with Subcontractors, Tracking and estimating change orders, Pay applications and working with the project Architects and Engineers to value Engineer costs for the client.
AIA Contracts
Projects by Microsoft
Excel by MicrosoftTimberline by Saga
Xactimate by Xactware
Contractors Office 6.0
Professional Experience: Insurance Restoration and Construction Defects
Project: Old Milltown, Edmonds, WA $7,600,000 - Project Duration: 12 months
Work was required to modernize a 90 year old 40,000 sqft building
Project involved removal of the interior building and leavening the exterior unreinforced concrete walls and rebuild a second building inside the second with a wood frame and Red Iron building system for three restaurants and retail space.
Project: Gregory Condos, Edmonds, WA $10,600,000 - Project Duration: 10 months
Work was required due to a fire before original construction was finished to a 90,000 sqft building.
Project involved removal and replacement of wood frame and Red Iron building system, repairs to the post tension deck, the finishing of 28 high end condo units and retail space.
Project: Blessed Sacrament Church, Seattle, WA $4,600,000 - Project Duration: 5 months
Work was required due to earthquake damage to a 90 year old Goth Cathedral Church
Project involved Seismic retrofit, restoration to unreinforced masonry and precast concrete a new slate roof and a full interior remodel.
Project: Waterfield Court, Aurora, CO $4,400,000 - Project Duration: 3 months
Work was required due to water intrusion of original construction system
Project involved removal and replacement of wood frame deck system, waterproofing membranes
And synthetic stucco applications for 680 units.
Project: Overlook at Lakemont, Issaquah, WA $6,600,000 - Project Duration: 6 months
Work was required due to water intrusion of original construction system
Project involved removal and replacement of wood frame deck system, stair towers and mid-landings waterproofing membranes and Hardi siding for 540 units.
Project: Holy Rosary Church, Edmonds, WA $1,600,000 - Project Duration: 8 weeks
Work was required due to water intrusion and construction defect of original construction system
Project involved Seismic retrofit, water diversion, pin piling, full interior remodel
References
References are available upon request.



Copyright 2013. All Rights Reserved.





View Resumes: mechanical engineer resume, electrical engineer resume, architect resume, construction resumes