Design Manager

Name : Richard D. Ohotorena
Industry Type : Design Build Firms- EPC
City & State : St. Petersburg, Russia,LO
Job Title Design Manager
Relocation Preferences : US
Objective : Provide and share technical expertise, skills and experience.
Resume :  
EXECUTIVE BRIEF


Experienced in several aspects of Civil engineering works such as,

1. Macro-Program Planning for multiple projects under single financial package. This includes feasibility studies, engineering, planning and monitoring.

2. Project management, planning and monitoring, and supervision.

3. Design and structural engineering structures and infrastructures.

4. Design and engineering for environmental performance.

5. Ability to develop innovations in engineering and construction.

20 years of combined experience in engineering and implementation of structures and infrastructures using different types of materials (such as concrete, masonry, wood, steel, aluminum, glass, plastic and rubber), applications and system of construction.

11 years experience in Structural Design and Analysis of structures and infrastructures, and 2 years in industrial development. Industrial development includes design and implementation of a manufacturing plant running on multiple steam boilers and pressure pipe system.

Some experience in structural rehabilitation and refurbishment of existing structures. Knowledgeable in structural investigation and analysis, field test procedures and equipments used in ascertaining structural reliability in rehabilitating old structures.

Efficient in design and development of structural drawings having exposed in detailed engineering and design of structures for 10 years. Well-versed in major standards such as British, American, Australian, ISO and European (under EOTA, CEN and DIN).




COMPANY: BOVIS LEND LEASE INTERNATIONAL LTD.

BLL is a UK based international company which specialized in Project Management of large construction projects and one of the largest construction companies in Europe.

ADDRESS:142 Northolt Road, Harrow Middlesex, HA2 0EE UK

TELEPHONE:(7 812) 448 3164 (St. Petersburg Office) and (7 499) 929-7979 (Moscow Russia Main Office)

POSITION AND JOB DESCRIPTION: SENIOR STRUCTURAL/DESIGN MANAGER. Provide technical direction and expertise in the design of structures during concept, working and detailed engineering design stages for ease of approvals of the design scheme by government bodies for approval of implementation next stage of design and ultimately for construction. Provide technical direction and expertise in the construction of structures especially for faade structures and interfaces to the main structure. Monitor system and structural performances during construction and aide to the prevention of failures in actual conditions. Monitor and supervise site works and coordinate with other relevant parties. In charge of implementing quality control and its procedures including supervision, design and structural verification of remedial measures done during construction of all structures of the development independent to the Design and Engineering Department. In charge coordination and correspondence between both the Main Contractor and Client on technical matters that affect both design and implementation. Oversee implementation of project/structural engineering procedures to assure safety, quality and structural viability of all structures during construction. Liaise with government in submission of design and engineering documents to facilitate approval.

DATE: JUNE 11, 2008 to Present


PROJECTS INVOLVED:Design and Project Management of the following project/s;

1.Proposed PHASE 1 OF OKHTA CENTER AND MULTI-FUNCTION DEVELOPMENT (96 STOREYS TOWER AND SURROUNDING DEVELOPMENT COMPOSED ROOF CONCOURSE CONNECTING 5 units of 10 STOREY BUILDINGS WITH ATRIA), ST. PETERBURG RUSSIA. Estimated cost of Phase 1 is at EURO 3.5 Billion

2.Proposed PHASE 2 to 4 OF OKHTA CENTER AND MULTI-FUNCTION DEVELOPMENT (CULTURAL CENTRE, TRANSPORTATION HUB AND LAND DEVELOPMENT), ST. PETERBURG RUSSIA. Estimated cost of Phase 2-4 is at EURO 2 Billion

3.Proposed NEVSKY RATUSHA Project in ST. PETERBURG RUSSIA (fixed budget cost of project still under development)

4.Proposed DANCE PALACE AND MUSEUM Project in ST. PETERBURG RUSSIA (fixed budget cost of project still under development)


COMPANY: PERMASTEELISA GROUP OF COMPANIES

An Italian subcontractor that specializes in the design and construction of custom-made curtain wall systems and other faade structures catering to special requirements from Clients. Currently, the company is the largest in the world in terms of project acquisitions with branches in the Europe, UK, US, Asia and Australia.

ADDRESS:38/F., MLC Tower, 248 Queens Road East, Wan Chai, Hong Kong

TELEPHONE:(852) 2201-6800 and 2520-2832 (Main Office)

POSITION AND JOB DESCRIPTION: SENIOR STRUCTURAL/PROJECT ENGINEER/SUPERVISOR. Provide technical expertise to the detailed design and construction of facade and its structures. Monitor system and structural performances during installation and aide to the prevention of failures in actual conditions. Monitor and supervise site works and coordinate with other concerned parties. In charge of implementing quality control and its procedures including supervision, design and structural verification of remedial measures done during installation of curtain wall independent to the Design and Engineering Department. In charge coordination and correspondence between both the Main Contractor and Client on technical matters that affect both design and implementation. Oversee implementation of project/structural engineering procedures to assure safety, quality and structural viability of the faade system during construction.

DATE: JUNE 11, 2002 to JUNE 10, 2008


PROJECTS INVOLVED:Project Supervision and Engineering in the Implementation of the following projects;

1. Proposed ACTIVE (BLUE WALL) UNITIZED CURTAIN WALL FOR THE COMMERCIAL AND OFFICE DEVELOPMENT IN 1 PEKING ROAD (32 STOREYS), TSIM SHA TSUI. 23,000 sq. meters with estimated cost of US$20 Million

2. Proposed INTERNATIONAL FINANCE CENTER II (NORTHEAST TOWER), CENTRAL, HONGKONG (89 STOREYS). 85,000 sq. meters with estimated cost of US$60 Million

3. Proposed POLICE HEADQUARTERS PHASE III at WAN CHAI, HONGKONG (42 STOREYS). 52,140 sq. meters with estimated cost of US$36.9 Million

4. Proposed ENTERPRISE SQUARE PHASE III at KOWLOON BAY, KOWLOON (42 STOREYS). 19,335 sq. meters with estimated cost of US$18 Million

5. Proposed CHURCH OF JESUS CHRIST AND ITS LATTER DAY SAINTS in TAIPEI, TAIWAN (6 STOREYS).

6. Proposed AIG TOWER at Admiralty, Hong Kong (38 STOREYS). 31,710 sq. meters with estimated cost of US$22.5 Million.

7. Proposed WYNNS HOTEL AND CASINO in MACAU (25 STOREYS). 26,853 sq. meters with estimated cost of US$19 Million.

8. Proposed Renovation/Refurbishment of MANDARIN ORIENTAL HOTEL, Central in Hong Kong (27 STOREYS). 8,578 sq. meters with estimated cost of US$6 Million

9. Proposed Office Development in WANG TAI ROAD (42 STOREYS), Kowloon Bay, and Hong Kong. 32,456 sq. meters with estimated cost of US$23 Million

10.Proposed Office Development, ENTERPRISE SQUARE Phase 5 (2 Towers x 34 STOREYS and 6 Level Podium), in Kowloon Bay, Hong Kong. 50,587 sq. meters with estimated cost of US$36 Million

11.Proposed Residential Apartment Buildings in Pollocks Path, The Peak: Stick wall systems, window wall windows and skylight.

12.Proposed Residential Building at Deep Water Bay; Marble stone and aluminum cladding, windows, sliding doors and balustrade systems.

13.Proposed Hotel Development at #88 Queens Road Central (15 Storey); Unitized curtain wall system and shop front.

14.Proposed Office and Commercial Development of the INTERNATIONAL COMMERCE CENTRE in Kowloon (118 STOREYS). 125,000 sq. meters with estimated cost of US$89 Million.

15.Proposed Office Development at HOW MING STREET (2 X 39 STOREYS), Kowloon Bay, and Hong Kong. 73,765 sq. meters with estimated cost of US$32.2 Million.

16.Proposed Office Development at SHEUNG YEE ROAD (47 STOREYS), Kowloon Bay, and Hong Kong. 36,320 sq. meters with estimated cost US$27 Million.

17.Proposed Hotel and Casino Development, ONE CENTRAL MACAU, (41 STOREYS + Roof). 21,000 sq. meters with estimated cost of US$11.6 Million

18.Proposed Casino and Hotel Development, COTAI PARCEL 5 & 6 AND TROPICAL GARDENS, VENETIAN OF MACAU. (2 X 41 STOREYS + Roof). Combined area of 172,000 sq. meters with estimated cost of US$95 Million



COMPANY: B. GRIMM MBM INTERNATIONAL

A company based in Thailand, medium sized German subcontractor that specializes in the design and construction of custom-made curtain wall systems and other faade structures. Formerly, the company services clients in the Middle East before transferring to Thailand.


ADDRESS:13/F., Room B, 133 Wan Chai Road, Wan Chai, Hong Kong

TELEPHONE:(852) 25-914-812 and 21-559-101 (MBM Faiveley Office)

POSITION AND JOB DESCRIPTION: SENIOR STRUCTURAL - SYSTEM DESIGN ENGINEER. Structural design and calculation of curtain wall, skylights, canopies and other structures based on glass, steel and aluminum materials for building facade and other purposes. Including system design of Automatic Platform Sliding Doors, Screen Panels and Emergency Exit Doors for Railway Line Platforms. Supervise a team of design staff for design submissions and coordinate other agencies for approval of submissions. Coordinate with clients, architects and consultants regarding design intentions and proposals for maintain design as what the owner and architects had conceptualized for the building.


DATE: DECEMBER 04, 2000 to MAY 15, 2002


PROJECTS INVOLVED: Structural Design and Detail Designing of PROPOSED POU CHEN DEVELOPMENT at Pou Yen Taiwan: OFFICE DEVELOPMENT (Formerly Swire House) at Charter Road, Central Hong Kong (30 STOREYS); PLATFORM SLIDING DOOR AND SCREEN PANELS for Kuala Lumpur Sentral Station, Kuala Lumpur Malaysia; PLATFORM SLIDING DOOR AND EMERGENCY EXIT DOORS for KLIA, Kuala Lumpur Malaysia (15000 meters); PLATFORM SLIDING DOOR AND SCREEN PANELS for Marina Line, Singapore (6000 meters); PLATFORM SLIDING DOOR AND SCREEN PANELS for Bangkok Blue Line, Bangkok Thailand (11000 meters); PLATFORM SLIDING DOOR AND SCREEN PANELS FOR MTRC Eastern Link, Hong Kong. PROPOSED RESIDENTIAL DEVELOPMENT AT IL7878, 10-12 Peak Road, Peak, Hong Kong (12 STOREYS); LOUIS VUITTON/GAYSORN PLAZA Faade Interface, Gaysorn Plaza, Bangkok, Thailand; Conceptual Design of Makoto Bank In Taiwan (30 Stories);



COMPANY: CHEVALIER ALUMINUM ENGINEERING

A US based company which is also an established main contractor in Hong Kong. The company had recently expands to specialty contracting of custom-made curtain wall systems and other faade structures. The company has branches in the US, Asia and the Middle East.

ADDRESS:3/F., Chevalier Engineering Service Centre, 21 Sheung Yuet Road, Kowloon Baye, Kowloon Hong Kong

TELEPHONE:(852) 2111-4988 and 2111-4957

POSITION AND JOB DESCRIPTION: SENIOR STRUCTURAL- SYSTEM DESIGN ENGINEER. Structural design and calculation of curtain wall, skylights, canopies and other structures based on glass, steel and aluminum materials for building facade and other purposes. Coordinate with clients, architects and consultants regarding design intentions and proposals for maintain design as what the owner and architects had conceptualized for the building.


DATE: DECEMBER 05, 1996 to APRIL 15, 1998 and April 16, 1999 to DECEMBER 04, 2000


PROJECTS INVOLVED: OFFICE AND COMMERCIAL DEVELOPMENT AT KTIL 192, Kwuntong, Kowloon; RESIDENTIAL AND COMMERCIAL DEVELOPMENT AT AN FU LU Road, SHANGHAI, CHINA (42 Stories); RESIDENTIAL AND COMMERCIAL COMPLEX AT TUEN MUN AREA 5B, Tuen Mun, N. T. (40 Stories); OFFICE AND COMMERCIAL COMPLEX AT KTIL 192 , Kwun Tong, Kowloon (42 Storeys); OFFICE AND COMMERCIAL COMPLEX AT KTIL 654, Kwun Tong, Kowloon (40 Storeys): OFFICE AND COMMERCIAL COMPLEX AT CASTLE PEAK ROAD; OFFICE AND COMMERCIAL COMPLEX AT WINGLOK ST, Shuen Wan, Hong Kong (39 Stories); SINCERE BUILDING, DALIAN CITY, DALIAN CHINA (30 Stories); HOTEL AND OFICE DEVELOPMENT AT King's Road, Quarry Bay, Hong Kong (42 Stories); Proposed OFFICE DEVELOPMENT at 88 Hing Fat Street North Point, Hong Kong; NINA HOTEL, Tsuen Wan N.T. (40 Stories); WESTPOINT BLDG. FACADE REINFORCEMENT AND REWORK, Connaught Road, Hong Kong (39 Stories): TAI PO INDUSTRIAL REFURBISHMENT, Tai Po, N.T.; Conceptual Design of NINA PODIUM Facade and Facade Support Structure in Tsuen Wan (5 Stories)


COMPANY: GARTNER-HAUKEE ENGINEERING LIMITED

Now named Josef-Gartner Contracting is a subsidiary of German owned facade contractor Josef Gartner that specializes in the design and construction of custom-made curtain wall and glass wall systems and other faade structures. The company is the largest in Hong Kong but with branches in the Europe, US and Asia.

ADDRESS:Unit 16, 6/F, Vanta Industrial Center, 21-23 Tai Lin Pai Road, Kwai Chung N.T., Hong Kong

TELEPHONE:(852) 24287338

POSITION AND JOB DESCRIPTION: SENIOR STRUCTURAL- SYSTEM DESIGN ENGINEER. Structural design and calculation of curtain wall, skylights, canopies and other structures based on glass, steel and aluminum materials for building facade and other purposes.


DATE: APRIL 16, 1998 to April 15, 1999


PROJECTS INVOLVED: PRINCES BUILDING REFURBISHMENT, Central, Hong Kong; LINCOLN HOUSE, Quarry Bay, Hong Kong; MTR-LAIKING STATION located in Lai King, New Territories.



COMPANY: ACTIVE CONSULTANCY

ADDRESS:2nd Floor Noahs Ark Building, Escolta St., Sta. Cruz Manila

TELEPHONE:(632) 243-08-80

POSITION AND JOB DESCRIPTION: STRUCTURAL ENGINEER. Scope of work includes structural design and engineering of public and private infrastructures such as public markets and commercial complex, warehouses and subdivision amenities.





DATE: MAY 01, 1996 to SEPTEMBER 1996


PROJECTS INVOLVED: PROJECT STUDY AND DESIGN OF TANAUAN COMMERCIAL COMPLEX, Tanauan, Batangas; FOOD TERMINAL INCORPORATED PROPOSED MEZZANINE FLOOR FOR DRY GOODS, Taguig, Metro Manila; PROPOSED 50,000 GALLONS STRUTURAL WATER TANK FOR CIUDAD MOLINO SUBDIVISION, Cavite, Metro Manila: PROPOSED THREE STOREY RESIDENTIAL BUILDING located in Pasig, Metro Manila.



ORGANIZATION: DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS AND DESIGN SCIENCE INCORPORATED

ADDRESS: 3RD Floor MMINUTE Bldg, SURP Compound, E. Jacinto St. UP Diliman Quezon City Philippines (Field Office)

59 Whitefield Street, White Plains, Quezon City, Philippines

TELEPHONE:(632) 79-56-74, 722-19-21, 920-69-30 up to 34


POSITION AND JOB DESCRIPTION: AREA COORDINATOR / CIVIL ENGINEER II / STAFF RESEARCHER. Oversee Project Coordination procedures on technical aspects for various project centers involved with the SECOND PROGRAM FOR ESSENTIAL MUNICIPAL INFRASTRUCTURES, UTILITIES, MAINTENANCE AND ENGINEERING DEVELOPMENT (PREMIUMED II). Collection of data and developing automated procedures for filing and presentation of information on the financial and technical accomplishments of ongoing project centers to all Government agencies including the Office President of the Philippines. Evaluate estimates and plans done by consultants as well as that of the preparation of bid documents for implementation of the projects. Also involve in evaluating structural and civil design of various infrastructures from horizontal (roads and bridges), vertical (public markets, commercial centers, slaughterhouses and other utilities) and transportation utilities (water-based structures (piers, wharves and embankments), airports and bus terminals.


DATE:AUGUST 01, 1994 to DECEMBER 06, 1996

PROJECTS INVOLVED:SECOND PROGRAM FOR ESSENTIAL MUNICIPAL INFRASTRUCTURE, UTILITIES, MAINTENANCE AND ENGINEERING DEVELOPMENT (PREMIUMED II), and THE SECOND METRO MANILA FRINGE INFRASTRUCTURES, UTILITIES and ENGINEERING PROGRAM (MMINUTE II FRINGE) of the Department of Public Works and Highways of the Philippine Government. The two projects are funded by the World Bank, which concerns on the development of infrastructures and service utilities on various and municipalities in the Philippines. (During the term of work, the two projects was handling and monitoring 40 Municipalities and 22 urban districts and assessing 15 more due to extension of the World Bank Loan).


LIST OF SOME MAJOR INFRASTRUCTURE PROJECTS WITHIN THE PROGRAM


1.Sta. Maria Bridge, Ilocos Sur: 2-Lane Pre-Stressed Concrete Deck Girder Bridge (438 lm) Project cost of P195 million.

2.Naguilian Bridge, Bauang-Baguio Road, La Union/Benguet: 687.8 lm of Bridge Project cost of P621.24 million

3.Mactan II Bridge, Lapu-lapu City / Mandaue City, Cebu: 4-lane Cable-strayed bridge (410 lm), 2.9 km approach roads. Project cost of P 2.5 billion.

4.South Samar Coastal Road: 44 km of Roads, 14 Bridges with Project cost of P1.21 billion

5.Bugallon Bridge, Pangasinan 392 lm; P158 million/IBRD

6.Ormoc City Flood Mitigation, Phase 1: 3 slit dams, 4 Bridges (263 lm each). Project cost of P676.10 million

Other projects that were monitored and technically supervised are listed in the above position and job description.



COMPANY: AL TAISEER ALUMINUM FACTORY

ADDRESS: P. O. Box 6416 Riyadh 11442 KSA


TELEPHONE: (966) 498-11-32, 498-30-59


POSITION AND JOB DESCRIPTION: INSTALLATION ENGINEER. In charge of project supervision and site coordination of on going projects which includes monitoring and scheduling of manpower and material delivery for smooth implementation of the projects. Act as quality control for delivery of materials on site.


DATE:SEPTEMBER 17, 1992 to JULY 21, 1993


PROJECTS INVOLVED:


Al Rahji 6 Villas, 3 storey with deck Residential Building, contract includes fabrication and installation of curtain wall, windows and doors.

Zeem Office Building, 4 storey office building, contract includes fabrication and installation of frameless curtain wall (unitized system) with operable windows.

Saudi Tel Administration Building Extension, 5 Storey office building, contract includes fabrication and installation of curtain wall system, entrance show windows.

Al Rahji Department Store, 5 level commercial building, contract includes fabrication and installation of curtain wall and operable windows, storefronts, doors.

Al Rahji Nasseriah (25 storey) condominium and commercial building, contract includes fabrication and installation of curtain wall, storefronts and entrance doors.



COMPANY: ALVIN GLASS AND ALUMINUM INCORPORATED

ADDRESS: # 995 SOT Bldg. EDSA, Project 7, Quezon City


TELEPHONE:(632) 98-56-03, 95-13-26, 98-56-88


POSITION AND JOB DESCRIPTION: PROJECT SUPERVISOR. An Area Supervisor who is charge of multiple projects which includes project coordination, engineering and supervision. Act as an assistant to the Production Manager taking charge in over all production scheduling, materials and manpower resources scheduling.


DATE:FEBRUARY 1989 to MARCH 1992


PROJECTS INVOLVED:


Abensons Blim Bldg. (4 Storey) located at Zapote Road Alabang Metro Manila.

National Bookstore Building (2 Storey) located at Pasay Road Makati, Metro Manila.

One Salcedo Place Building (12 Storey) Condominium located at Alfaro St. Salcedo Village, Makati Metro Manila.

Robinsons Galleria (5 Storey mall) located at Ortigas cor. Edsa Mandaluyong Metro Manila.

H. Esguerra Residence (2 Storey) residential bldg. located at Harvard St. Wack Wack Subd. Ortigas.

Regines Bldg. (10 storey) hotel/condominium located at Kalayaan St. Makati, Metro Manila.

Le Triomphe Bldg., 20 storey condominium, Senator Gil Puyat Avenue, Makati, Metro Manila.

OAC Building a (4 storey) office building located at San Miguel Avenue, Pasig Metro Manila.



COMPANY: PARAGON CONSTRUCTION COMPANY INCORPORATED

ADDRESS: # 10 Greenfields St., Gloria II Subdivision, Tandang Sora, QuezonCity


TELEPHONE:(632) 99-49-63


POSITION AND JOB DESCRIPTION: Started as a Timekeeper, Materials Comptroller and Assistant Project. Supervisor in charge of over all construction works, materials take-off and estimates.

DATE:JANUARY 1986 to JANUARY 1989


PROJECTS INVOLVED:

Maramag-Kibawe-Kabacan Road, Carmen-Damulog Section, North Cotabato, 6.36 kilometer P57.9 million/IBRD. Direct access between Bukidnon and North Cotabato

Agdao Flyover and Approaches, Davao City 180 lm, 4-lane Bridge with a project cost of P125.8 million

Standard Electric Showroom (4 storey) located at Taft Avenue, Pasay City. Pile driving, Foundation works and Superstructure Erection.

Standard Metro Mercantile (2 storey) warehouse located at Taft Avenue, Pasay City.

Plastic Group Philippines Incorporated, Calamba Laguna 30 M x 60 M Portal Frame Structural Steel Warehouse.

Ang Commercial Building (3 Storey) located at Abad Santos, Tondo Manila, Excavation of Foundation and Erection of Superstructure.

Church of Jesus Christ and his latter day Saints located at Bian, Laguna. Items of work include earth filling and concrete paving of areas surrounding the building proper.

Plastic Group Philippines Incorporated, Calamba, Laguna. A multiple projects contract which includes the following: Uni-plastic (4 storey) Mixing Plant; Calender No. 3 Machine Foundations; Portal Frame Structural Steel Warehouses, 1- (30x60m) and 1-(30x40m); Concrete paving and earth filling of 30 x 60m area in preparation for a warehouse

Church of Jesus Christ and his Latter Day Saints located in Bayambang, Pangasinan.



PROFESSIONAL AND ORGANIZATIONAL MEMBERSHIPS


Reviewer
Research Manuscripts for Advancements in Concrete and its Applications
AMERICAN CONCRETE INSTITUTE December, 2006

Associate Member
AMERICAN SOCIETY OF CIVIL ENGINEERSJanuary, 2004

Member
STRUCTURAL ENGINEERS ASSOCIATION INTERNATIONALOctober, 2001

Member
PHILIPPINE INSTITUTE OF CIVIL ENGINEERSOctober 1994 to Present

Member
ASIAN INSTITUTE OF MANAGEMENTOctober 1991 to Present




SEMINARS AND ADVANCE COURSES ATTENDED


Commercial Requirements for the 2006 International EnergyJune 15, June 22 and
Conservation Code, for Building Envelope, Mechanical andJuly 13, 2006
Lighting
Building Energy Codes - US Department of Energy


Master in Structural EngineeringJune, 1995
University of the Philippines located in Diliman Q.C. to
Units Masters DegreeOctober, 1995


Seminar on Microsoft Operating System
and Applications
Blue Room MMINUTE Office SURP Compound
University of the Philippines, Diliman, Quezon City


Lotus 1-2-3 Release 4 for Windows May 15, 1995
to
May 20, 1995


Microsoft Word for Windows Ver 6.0April 17, 1995
to
April 22, 1995

Microsoft Windows Ver. 3.10March 27, 1995
to
April 01, 1995

Microsoft Disk Operating System Ver. 6.0March 13, 1995
to
March 18, 1995

Build Operate and Transfer Scheme
Construction Industry Authority of the PhilippinesDecember 06, 1991
Milwaukee, Quad Arcade, Makati


Construction Management Course October 17 1991
Asian Institute of Management to
Paseo de Roxas, Makati MMNovember 03, 1991

Contract ManagementAugust 04, 1990
Pre-Construction Planning and Construction Operationto
Asian Institute of Tourism August 18, 1990

Road Construction Methods and TechniquesAugust 22, 1989
Construction Manpower Development Foundationto
PCI Bank Building, Pasong Tamo, Makati MMAugust 25, 1989



LICENSURE AND ELIGIBILITY EXAMINATIONS TAKEN AND PASSED


PROFESSIONAL REGULATION COMMISSION
Civil Engineering Licensure ExaminationMay 21 and 22, 1994
Passing Grade 81.3 %

CIVIL SERVICE COMMISSION
Career Service Professional Examination August 3, 1986
Passing Grade 80.0 %

CIVIL SERVICE COMMISSION
Career Service Sub-Professional Examination January 30, 1984
Passing Grade 83.13 %



EDUCATIONAL BACKGROUND

COLLEGE Far Eastern University1981 - 1986
Institute of Technology
Diliman, Quezon City

Course: Bachelor of Science in Civil Engineering

HIGH SCHOOL Far Eastern University 1977 - 1981
Boys High School
Morayta, Manila

INTERMEDIATE SCHOOL Far Eastern University 1975 - 1977
Grade School
Morayta, Manila

PRIMARY SCHOOL Saint Michaels College 1971 - 1975
Elementary School
Iligan, City

Dominican School1968 - 1971
Nursery and Preparatory
Gov. Forbes, Manila

OTHER SKILLS

Experience on use of different Computer Programs
and Applications and Development of Customized
Program or Application for Engineering, Architecture
Research and Financial Analysis using Microsoft \Applications.
Computer Programs such as;


Microstran Version 5.0, STAAD III, MICROPIAP
SAP 90 and SAP 2000, ETABS 2000, SADS, Space Gass
Stran v7 and ADINA Finite Analysis Programme

Thermal performance for Building Analysis Programs such as the Following
WINDOW V6.0 (Thermal Transfer Analysis of Windows and Glazing System)
THERM V2.1 (Thermal Performance Analysis), SOLAR 5, RADIANCE, OPTICS 5


Microsoft Project Management / Harvard Project Management/Primavera Project Planner

Auto Cad Releases 12, 13 and 14

Math Cad 5.0 to 2001 /Math Lab v6.1



CHARACTER AND PROFESSIONAL REFERENCES


Ted Graban General Managerc/o Permasteelisa (Shanghai)
Permasteelisa (Shanghai)Dong Yi Rd., Shanghai 200002, P.R.C
Tel. 86 21 63299988242 Shanghai Bund No.12 Zhongshang


Andrew Bateman Contract Manager c/o B. Grimm MBM HK Ltd.
B. Grimm MBM Hong Kong35/F, 133 Wan Chai Road,
Limited/ Tel. (852) 9133-4769Wan Chai, Hong Kong


Tom Kosmala Senior Consultantc/o Chevalier Aluminum Engineering
ACSI Curtainwall Consultancy3/F Chevalier Engineering Service
Limited / Tel. (852) 6071-0412Center, Sheung Yuet Road, Kowloon
Bay, Kowloon Hong Kong

Lysander P. Lam General ManagerRm. 218, Wellbourne
P. C. Lam and AssociatesCom. Center., # 8 Java Rd.
Limited / Tel. (852) 2566-2033North Point, H.K.

Bruce C. Wymond Regional Manager, MeinhardtLvl. 5, Wah Ming Cntr., 421
Facade Technology HK Ltd.Queens Rd. West H. K.
Tel # (852) 28580738

Teodoro Encarnacion Under-SecretaryDPWH Bldg. Port Area,
Department of Public WorksManila, Philippines
And Highways

Demetrio Demetria Under-Secretary/Lawyer#88 Kasoy St. BF Homes
Diliman, Quezon City

Panfilo B. Iyog Lawyer Suite 302, Don Jose Bldg.
Quiapo, Manila

Ariel S. Lunod Businessman 3-B Palma St. Xavierville
Subdivision, Q.C.


Please note the some referees are not available for interview either they have transferred to new work locations or went back to their respective countries. The names of referees available for interview were marked in bold letters along with their new contact numbers.




EMPLOYMENT REFERENCES


COMPANY: PERMASTEELISA HK LTD.


Y.Y. CHEUNG Managing Director (China)

TED GRABANGeneral Manager (Shanghai)

JOHNNY CHOI General Manager (Hong Kong)


COMPANY: B. GRIMM MBM INTERNATIONAL HK LTD.


DR. DIETER HEGEN Managing Director (HK Office)

THOMAS SCHULTZFinance Director

ROLAND KWUESKER Overall Director for Asia


COMPANY: CHEVALIER ALUMINUM ENGINEERING


RAYMUND HUI General Manager

ANGELINE QUOKAdministrative Manager

JACKIE HUI Contracts Manager


COMPANY: DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PREMIUMED II PMO


CLARO DOMINGO Chief, Monitoring Division

IMELDA ALBERTOAdministrative Officer

RAY MARQUEZ Chief, Financing Division


COMPANY: DESIGN SCIENCE INCORPORATED

ANTONIO PANELO Structural Engineer

JOVITO SAMBILAYConstruction Engineer


COMPANY: AL TAISEER ALUMINUM FACTORY

DAVID WRAY Group General Manager

MOAZ A. EL- SALAMFinance and Administration Manager

ABOUDI JILDAYEHOperations Supervisor


COMPANY: ALVIN GLASS AND ALUMINUM INC.

YDELFONSO TIAM LEE JR.General Manager

ROSE TIAM LEEMaterials Comptroller

REY HORMECHUELOSProduction Manager


COMPANY: PARAGON CONSTRUCTION COMPANY INC.

JOHNNY LIM Project Engineer

BENIGNO MANDAPProject Architect

REMEGIO PO Project Engineer





I hereby certify that the above information is true and correct to the best of my knowledge and belief.





_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

RICHARD D. OCHOTORENA

HK ID #: P669056 (8)
ISSUED ON: 02 January 1997


Copyright 2013. All Rights Reserved.





View Resumes: mechanical engineer resume, electrical engineer resume, architect resume, construction resumes