Stone Specialist

Name : DMJM STONE SPECIALIST LLC
Industry Type : Specialty Contractors
City & State : PALMDALE,CA
Job Title Stone Specialist
Relocation Preferences : LOS ANGELES
Objective : OBJECTIVE
Challenging position in the field of Architecture, utilizing my expertise in Construction industry, Project Management, Architectural Design, Civil Engineering Design and Estimating. Experienced in commercial, residential, road development and industrial project.

EDUCATION
B.S. in Architecture, Far Eastern University, Manila Philippines
AutoCAD training, Massey Community College, Houston, Texas
Seminar on quantity take-off and estimating program techniques, Techsonics, Inc.

List of Project:
1.Cathedral Lady of Angels
Temple St., Los Angeles, CA
2.Anahiem Arena, ( The Fond)
Anaheim, California

3.Emerald Shapery( Pan Pacific Building)
San Diego, California
4.Grand Hyatt Wailea
Wailea, Hawaii
5.International Duty Free Inc.
Airport, Hongkong
6.Japanese Int\\\'l Golf Course
North Japan
7.Ana Hotel
San Francisco, CA
8.J. C. Penny Store
San Francisco, CA
9.Namseoul Hotel
Seoul,Korea
10.American Airlines
Los Angeles, California
11.Hollywood Hotel ( Rennaisance)
Los Angeles, Ca
12.Salk Institute
San Diego, Ca
13.San Diego Ballpark
San Diego, Ca
14.Darlington Hotel
Los Angeles, Ca
15.Liam Residence
Oxnard, Ca


Resume :  

PROFESSIONAL EXPERIENCE


 


Romalia Stone       


Architectural  Design/ Drafters/Estimator


             Redondo Baech, CA                               May 2009- Present


1.       San Antonio River Ctr


          San Antonio TX


                           - Responsible in estimating the cost, quantity of materials needed in any given project.


                           -Responsible in giving bids on time to all contractors


                                 Also cost and value engineering   of the project and shop drawing


                                 


  Romala Stone       


 Architectural Design/ Drafters/Estimator


             Beverly Hills, CA                    May 2008- May 2009


2.       Marriott Hotel


 San Diego , California


                           - Responsible in estimating the cost, quantity of materials needed in any given project.


                           -Responsible in giving bids on time to all contractors


                                 Also cost and value engineering   of the project and shop drawing


 


 


Executive Stone Trading       


Architectural Design/Drafter/Estimator


              North Hollywood, CA                           April 2004- April 2008


          1.Miami Hotel


       Miami, Florida


-Responsible in marketing the most beautiful stone in the world, which is Jerusalem stone. Making sure that Architects, Designers, Contractors, and Developers that this stone can be used in floor, wall facade, column, Fire places and exterior paving.


 Stone Mart Inc                


Architectural Design/Drafter/Estimator


              North Hollywood, CA                           July, 2002-April 2004


         1.San Diego Ballpark


       San Diego, Ca


         2. Whittset, Coldwater Canyon, Califa Housing


Dev


        North Hollywood, Ca


                                  -Responsible in estimating the cost, quantity of materials needed in any given project.


-Responsible in giving bids on time to all contractors. Also cost and value engineering     of the project


Carnevale & Lohr Inc.    


 Estimator/Project Coordinator /AutoCAD Designer/Inspector


              Bell Garden, California                       June, 2000-July, 2002


  1.Cathedral Lady of Angels


                           Temple St., Los Angeles, CA


                        2 Salk Institute


      San Diego, Ca


         3 American Airlines


      Los Angeles, California


          4. Hollywood Hotel (Renaissance)


       Los Angeles, CA


-Responsible for coordinating all responsible person such as Installer, Setter, Project Architects, Contractors, Sub-contractors, Superintendent and Owner would be in the pace and if there are change order making sure that they have the memo and copy of the change order and copy of the blue prints.


-Responsible of preparing the master plan and drawings will be change according to the change order. And this change order should be apply properly at the job site. Also making sure that the materials would available on time.


-Responsible that the pieces specified on specific area would arrive at the jobsite on time. Making that the pieces is marked properly to identify these pieces to be set properly according to the drawings.


-Responsible in checking the drawings and all the missing pieces and submit to our shop for local fabrication.


 DMG Marble & Granite               


Architectural  Design/Drafter/ SR Estimator


              Sun Valley, California                         November 1996 - May 2000


                          1. Ana Hotel


      San Francisco, Ca


2.  Versa (Caesar Palace)


Las Vegas, NV


-Responsible estimating the cost of materials, freight cost and estimated time of delivery.


                            -Responsible for preparing AutoCAD drawing and cutting list for the factory.


 -Responsible in coordinating the factory, Architectural department and Client of the                                                                                                        time of delivery at the jobsite.


                                                             


Globe Marble & Tile, Inc.                             


  Sr. Estimator/ AutoCAD Technician


North Hollywood, California                           September, 1989-November 1996

          1. Anahiem Arena, (The Fond)


      Anaheim, California


         2.Emerald Shaper(Pan Pacific Building)


     San Diego, California


3.Grand Hyatt Wailea


                       Wailea, Hawaii


                           -Responsible estimating the cost of materials, freight cost and estimated time of delivery.


                           -Responsible for preparing drawing and cutting list for the factory.


                       -Responsible in coordinating the factory, Architectural department and Client of the                                                                                                                    time


of delivery at the jobsite.


                           -Responsible of preparing the master plan and AutoCAD drawings will be change  according to the change order. And this change order should be apply properly at the job site. Also making sure that the materials would available on time.


-Responsible that the pieces specified on specific area would arrive at the jobsite on time. Making that the pieces is marked properly to identify these pieces to be set properly according to the drawings.


-Responsible in checking the drawings and all the missing pieces and submit to our shop for local fabrication.


 E.I.S.I.                                                   Structural/Mechanical Draftsman


Seattle, Washington                                           September 1986-September 1989


                         1. Metro Northbase Interchange


         Washington


       2. Sieg Hall University of Washington


        Seattle, WA


                         3. Skagit Valley College, Dept Gen 


                                       Admin.Washington


                 -Responsible Civil/Architectural Drawings for Commercial and School project.


                  -Responsible for Electrical/Mech. Drawings for Commercial and School projects.


                  -Responsible for the bill of materials such as concrete, wood, dry wall, electrical parts,


                Mechanical part and etc. 


-Responsible of preparing the master plan and drawings will be change according to the change order. And this change order should be apply properly at the job site. Also making sure that the materials would available on time.             


R & R Marble Inc.                        Estimator/Architectural Draftsman


Houston, Texas                                    November 1984-September 1986


         1 East Texas Saving


     Tyler, Texas


        2.Century National Bank


     Houston Texas


        3.One Ridgemar Center


     Fort Worth, Texas


                            -Responsible for preparing AutoCAD drawing and cutting list for the factory


                            -Responsible for estimating the cost of materials and estimated time of delivery.


 -Responsible in coordinating the factory, Architectural department and Client of the                                                                                                        time of delivery at the jobsite.


                            -Responsible for development design, construction and alteration drawing.


                         


 


                And if there are change order making sure that they have the memo and copy of the the         


                            change order and copy of the blue prints


-Responsible of preparing the master plan and drawings will be change according to the change order. And this change order should be apply properly at the job site. Also making sure that the materials would available on time.


 Dome Construction.                         


Architect/Estimator


Quezon City, Philippines                                   February 1981-October 1984


       1 H.R Lopez Warehouse


              Pasig, Rizal


 


      2. Lighthouse Pub & Restaurant


    Quezon City, Philippines


               -Responsible Civil/Architectural Drawings for Commercial project.


                -Responsible for Electrical/Mech. Drawings for Commercial projects.


                -Responsible for the bill of materials such as concrete, wood, dry wall, electrical parts,


                  Mechanical part and etc. 


Responsible for construction and supervision 


   MSB Trading Inc.                                   


 Architect/Estimator


  Manila, Philippines                                       

 January 1981-October 1977

      1 H.R Lopez Warehouse


         Pasig, Rizal


       2. LightHouse Pub & Restaurant


         Quezon City, Philippines


                              -Responsible Civil/Architectural Drawings for Commercial project.


                  -Responsible for Construction and supervision


                  -Responsible for the bill of materials such as concrete, wood, dry wall, electrical parts,


                  mechanical part and etc. 


- Responsible of preparing the master plan and drawings will be change according to the change order. And this change order should be apply properly at the job site. Also making sure that the materials would available on time.


  Ultima Development Corp                    


 Architect/Estimator


     Manila, Philippines                                      January 1976-September 1977


          1 South Green Park Townhouse


     Paranaque, Philippines


                            -Responsible Civil/Architectural Drawings for Commercial & Residential  project.


               -Responsible for Construction and supervision


               -Responsible for the bill of materials such as concrete, wood, dry wall, electrical parts,


                  Mechanical part and etc. 


- Responsible of preparing the master plan and drawings will be change according to the


Change order. And this change order should be apply properly at the job site. Also making sure that the materials would available on time.


 


J.R Zapanta and Asso.                              Architectural Draftsman/Estimator


     Makati Philippines                                       March 1976-April 1975


     1 Baliuag Bulacan Circle


 Bulacan, Philippines


     2. Zeta Building


         Makati, Philippines    


                             -Responsible Civil/Architectural Drawings for Commercial project.


               -Responsible for Construction and supervision


               -Responsible for the bill of materials such as concrete, wood, dry wall, electrical parts,               


Mechanical part and etc. 


-               Responsible of preparing the master plan and drawings will be change according to the specs.


Copyright 2013. All Rights Reserved.





View Resumes: mechanical engineer resume, electrical engineer resume, architect resume, construction resumes