To work for a commercial or residential construction firm as a Jr. Project Manager, Project Manager, Site Superintendent or Cost Estimator.
|
| Resume : |
JONATHAN ALAN HASTY
100 Cartgate Circle Blythewood, SC 29016 (803) 333.8166 (H) (828) 320.2611 (C)
E-mail: jonandamyhasty@att.net
V.P. of OPERATIONS BUSINESS PROCESS OWNER INDUSTRIAL ENGINEERING MANAGER
Hands on executive with strong production, cost reduction, inventory control and engineering experience. Dynamic problem solver with strong interpersonal skills and the ability to maximize employee involvement through the use of continuous improvement. Highly motivated, results oriented team manager adept at coordinating strategic goals.
CORE ABILITIES
Leading continuous improvement
New facility construction management
Fixture/Jig design & build
Communication/Teambuilding
Benchmarking using Key Metrics
Value Stream Mapping
Process Engineering
24/7, 3 shift production management
Facility layout
Engineering management
Cost justification of equipment
Residential home construction
MAJOR ACHIEVEMENTS
Completed a new, 1700 sq. ft. custom, stick built home using Critical Path Method (CPM) in less than 3 months
Ran a $8-9M, 3 shift, Tier 1 supplier operation to CAT, John Deere, Freightliner and Snapper with 90+ employees
Decreased the set up time on two 5 axis CNC’s from 22 minutes to 3
Increased utilization of the 5 axis CNC machines from ~60% to over 90%
Decreased the program run time of approximately 50, 5 axis programs by up to 18% each
Managed the construction, purchasing of all equipment and layout of a 40,000 sq. ft. plant expansion
Managed the construction, purchasing of all equipment and layout of a 26,000 sq. ft. warehouse expansion
Opened up 380,000 sq. ft. of manufacturing space using Lean Manufacturing Techniques
Worked continuously for 6 months with rotating team to set up a Kanban system in a parts storage area reducing floor space 38%, WIP inventory 51.7%, and lowered number of parts shortages 75%, and eventually it was near 0. Dollar value of inventory dropped from ~$4.5M to ~$1.3M in two years
Brought company lead times down from 12-14 weeks to less than 30 days, while COT went up over 20%
PROFESSIONAL EXPERIENCE
PARKER DAVIS CONSTRUCTION, LTD., Hickory, NC 2008-Current
President and CEO, Licensed General Contractor: Limitation: Limited, Classification: Building
Performing all functions related to owning a business; estimating, writing contracts and proposals, building customer relationships, managing subcontractors, accounts receivable, accounts payable, hands-on building, etc.
Applying for SC General Contractor’s license
NORTHWEST BUILDING COMPANY INC., Hickory, NC 2006-2008
VP of Operations, Licensed General Contractor: Limitation: Limited, Classification: Building
Responsible for multiple speculative and custom home sites
Accomplishments
Acted as Operations Manager overseeing multiple projects and various subcontractors building to a set schedule
Completed 12 homes from start to finish and 3 remodels according to a building schedule
JONATHAN ALAN HASTY Page 2
Completed the construction and presentation of a 2008 Parade of Homes house
Passed the NC General Contracting Builder Exam in November of 2006, currently licensed in my personal name
CENTRO INCORPORATED, Claremont, NC 2005-2006
Business Process Owner
Responsible for multiple production lines
Accomplishments
Increased uptime to over 83% on 2, 5-axis CNC’s, goal was 90%
Responsible for 90+ employees, 7 direct, ~85 indirect and approximately $9.5M in finished product
Reduced staffing on two molding lines by $84K in direct labor, while not increasing overtime and keeping production constant
Responsible for key metrics; safety, quality, cost control, COT delivery, productivity, FG inventory, machine uptime
Completed Root Cause Analysis on quality issues using different techniques until the issue(s) were resolved
Coordinated daily production schedules with the shipping, scheduling and support staff to meet customer orders
Manufacturing Engineer 2003-2005
Responsible for plant related engineering functions
Accomplishments
Responsible for three Engineering Techs and one 5 axis CNC programmer
Managed fixture design, implementation and repair for all new and existing products in the plant
Coordinated and led the design and construction of a new 50,000 sq. ft. manufacturing facility
Worked on machine set-up reduction using SMED concepts
Managed the creation and maintenance of Visual Work Instructions
Managed the creation and maintenance of Standard Work for each part
Responsible for design approval and installation of $1.5M in rotational molding machines and related equipment
Helped with the acquisition of a new form of leak detection for fuel tanks
Cost justified a powdered resin dispensing system for the entire plant, which reduced direct costs by ~$120K a year
WARVEL PRODUCTS, Lexington, NC 2001-2003
Engineering Manager
Responsible for all engineering and R&D functions
Accomplishments
Responsible for two finished goods warehouses containing $3M+ in inventory
Managed construction for new 26,000 sq. ft. warehouse constructed on site
Planned and purchased equipment and storage for new warehouse
Implemented software project, bringing up two plants’ BOM’s, routings and raw materials from scratch
Tested new chairs using BIFMA approved testing equipment
Traveled all over the US meeting customers, showing them how to build our existing products, getting their opinion on developing new products and fixing any quality and/or shipping issues that they may have
Managed three engineers and three R & D employees
Configured costing for new products
Managed creation of CNC programs using MasterCam and Rhinoceros for new products on 4 CNC Heian 3 axis routers and 1 CMS 5 axis router
Created 3D exploded assemblies and parts drawings of all parts using Solid Works in our Engineering group
HICKORY CHAIR, Hickory, NC 1999 – 2001
Continuous Improvement Coordinator
Responsible for improving the “Key Measures” of plant: quality, cost, on-time delivery, inventory turns, productivity and safety.
Accomplishments
Planned and coordinated 2 Kaizen teams a month and either led, co-led, or participated in one of the teams, in the plant and office
JONATHAN ALAN HASTY Page 3
Accomplishments cont.
Conducted monthly 5S evaluations of the entire plant
Created a current state value stream map of our current position, and a future state VSM vision for both plants
Moved entire machine room from a non-flow oriented layout to almost a completely cellular flow
Reduced complexity and waste in the system by eliminating reports, NVA (non-value-added) practices, excess movement, overproduction, and consolidate vendors.
Became 5S and Lean Manufacturing trainer (training tools include books/audio tapes of The Goal, Lean Thinking and The Machine that Changed the World, one piece flow exercises, train-the-trainer and Leggo assembly factory)
Attended the Shingo Prize in Milwaukee, WI and learned from speakers representing Ford, IOMEGA, Wiremould, etc.
Mentored under a consultant formerly of the Toyota Supplier Support Center who helped design a new layout of the plant based on product lines within the existing facility
Worked continuously with a rotating team to set up a Kanban system in our parts storage area which reduced floor space from 32,800 sq. ft. to 20,350 sq. ft. (reduction of 37.9%), WIP Inventory from approx. 869,000 parts to 420,000 parts (reduction of 51.7%), and lowered the number of parts shortages from 400 to 96 (reduction of 76%)
Reduced sq. footage in one manufacturing plant by approx. 380,000 sq. ft., (reduction of 38%)
Industrial Engineer 1998 – 1999
General Industrial Engineering Responsibilities
Accomplishments
Worked in engineering creating parts routings and conducting time studies
Helped bring in Time Quest, a program designed to help in costing new products
Helped bring in Solid Edge
Completed a drawing of the entire plant, machines and workstations in AutoCAD
Created a Visual Basic program in Excel to be used by product engineering to automatically rate set-up and run times for new parts based on standard data, thus eliminating the need for my position in Engineering
EDUCATION
BSBA: Production & Operations Management, Appalachian State University, Boone, NC, 1998, Cumulative GPA 3.3
2008, Completed a Residential Construction Estimation course at Caldwell Community College and Technical Institute
2006, Completed a General Contractors Licensing Preparatory course at Caldwell Community College and Technical Institute
2006, Accepted into Appalachian State University’s MBA Program
OTHER EDUCATION
General Contractor Builder Examination passed in November, 2006
TFI: Thomasville Furniture Industries Supervisory Training Series, Managing People with Tact and Skill
Shingo Prize, Milwaukee, WI, 2000
AFFILIATIONS
Assistant Scoutmaster, Troop 1, Corinth Reformed Church
Property Management Board Member, Corinth Reformed Church
Leader of the Handyman Ministry at Corinth Reformed Church
Former VP and Treasurer: ASU Student APICS chapter
ADDITIONAL SKILLS AND AWARDS
AutoCad 2009 LT
AutoCad R14
AutoCad 2002
Solid Works, Rhino
MasterCam
MS Office; Excel, Word, Outlook, Outlook Express, Access, MS Project
Eagle Scout, 1992
|
|
|